Description
Work shall include the demolition and removal of the decommissioned water treatment plant at 115 West Haller Ave; commonly referred to as the Old WTP. This approximately 1,800 square foot 2-story concrete building is located along Haller Ave and within the existing City Public Works Utility Yard. Additionally, a 600 square foot wood framed, and steel panel garage will also be removed. Removal includes the disposal of all aspects of the structure, foundation, and all above ground utility appurtenances that are not owned by a utility company.The Old WTP exterior concrete walls along the southern and eastern side of the existing building shall remain in place to an elevation of at least 1 foot above existing grade outside of the structure. The site can be graded to allow for complete removal of the structure along the northern and western edges of the building. The existing structure has numerous interior and exterior concrete walls that are perpendicular and structurally connected to the foundation walls that will remain in place to continue to retain the adjacent grade. Along the south and east edges of the building, the perpendicular interior walls, the building slab, and associated foundations will remain in place to provide support to the exterior walls. The interior concrete walls, slab, and foundations should remain in place a minimum distance equal to the retained height of the associated walls. Alternatively, if removal of the interior walls is desired or required, the slab and foundations remain in place (to a minimum distance equal to the retained height of the adjacent wall) and bracing be installed to support the exterior walls. To reduce the potential for damage the walls, the interior walls, slab, and associated foundations are to be saw cut. See Attachment 01 Removal and disposal may be completed by select salvage and asset recovery, or by demolition and disposal. The City will allow removal of landscape and fencing items to complete this scope of work.
Important Dates
Publication Date
11/9/2023
Closing Date
11/21/2023
Timeline
Publication Date11/9/2023
Closing Date11/21/2023
Pre-bid Meeting11/14/2023
Location
115 West Haller Ave
Arlington, WA
Submission Requirements
Submittal Information: 154 W Cox Ave, Arlington WA 98223 or email utilities@arlingtonwa.gov
Submission Deadline: 11/21/2023
Eligibility Criteria
Work shall be scheduled and performed in compliance with all federal, state, and local health, safety, and environmental regulations. Contractor is responsible for adhering to all state safety requirements and making sure all necessary safety certifications on workers are current. The structures were surveyed for Asbestos Containing Material (ACM) and the tests came back positive; refer to the Asbestos Survey Report. Asbestos Containing Material has been removed from the structures by a licensed asbestos abatement contractor and disposed of at a state licensed disposal facility permitted to accept Asbestos Containing Material. Lead Based Paint (LBP) has been completed; results are in Attachment 03.6. Contractor will remove and properly dispose of all non-hazardous debris generated from performing this work in compliance with County and state regulations. Contractor will catalogue and record all salvaged material, if any, generated from performing this work. Work to be performed under this contract is subject to prevailing wage. Contractor shall obtain all required State and City Permits. Contractor shall contact 811 for utility locates prior to demolition. Project site will be secured at all times. Maintain clean work area, recycle materials when possible. Clean up and dispose of all debris, remove existing equipment from the premises. All demolition and removal will be completed in 30 working days from the date of the City’s Notice to Proceed.
Documents
Contact Information
Additional Information
Pre-bid Conference
A mandatory pre-bid conference will take place at the City of Arlington Public Works Administration building on November 14, 2023 at 10:30 AM. The meeting will start at the PW Admin building and then proceed to the project site. The PW Administration building is located at 154 West Cox Ave, Arlington WA 98223.
Related Documents
Related Documents: Request for Proposal P02-500-3 Water Plant Demo 11-21-2023 (https://www.arlingtonwa.gov/DocumentCenter/View/9745); P02-500-3 WTP Demo Project Bid Tab (https://www.arlingtonwa.gov/DocumentCenter/View/9801); Certified Bid Tab - Old WTP Demo 11-21-2023 (https://www.arlingtonwa.gov/DocumentCenter/View/9886)