169th St Connector - Request for Qualifications
164
Category
Closed
Description
PROJECT DESCRIPTION BACKGROUND – This project proposes to design a new road that will provide an alternate route for freight and vehicles from the main state highway, SR-531, east of 169th Street NE and support the fast-growing industrial area located in the Cascade Industrial Center (CIC). The 169th St Connector will have an E-W alignment connecting Smokey Point Blvd on the west to 43rd Ave NE and 168th Street NE on the east and include multimodal improvements. This city has been working with an engineering consulting firm and have completed a 30% drawing design package. The current stage of design is approaching a 60% design package, and the prospective engineering firm will need to establish communication with the previous consultants to continue with the design from its current stage, as needed. PROJECT – Continue the design of a new road with two travel lanes and grade separated pedestrian facilities, a 5-foot-wide sidewalk on one side (where applicable) and a 12-foot-wide multiuse trail on the other. The roadway will include pedestrian and street lighting, street amenities (landscaping, benches, trash cans, etc.), and local area art (where applicable); it will also include new storm utilities for the proposed hardscape and converting a type 3 urban ditch to new underground culvert beneath the proposed roadway. This roadway will be located in between commercial and residentially zoned areas. The project will require intersection design for the intersections located at 40th Ave NE and 43rd Ave NE. The new road will total approximately 0.31 miles. FUNDING – This project has received federal funding for the completion of the project design. The City of Arlington is providing matching local funds as well. SCOPE OF WORK The work to be performed by the CONSULTANT includes engineering analysis, design plans, specifications and estimate necessary for the project to receive NEPA certification and advertisement for the 169th St. Connector Improvement project. The major features of the project are as follows: • Preliminary Design Data Collection: Consultant team shall collect necessary data and information for the successful completion of this project. This includes coordination with the previous consulting firm to obtain existing design data, as needed. • Design Reports and Studies: Consultant team shall complete all studies and evaluations necessary for the successful completion of this project design and permitting. • Project Design and Specifications: Consultant team shall prepare preliminary and final engineering plans and specifications (60%, 90% and Issue for Bid (IFB)), project bid documents and ROW Plans. All submittals shall be consistent with WSDOT standards for federally funded projects. • Estimate of Project Costs: Consultant Team shall prepare an estimate of probable costs for the construction phase (60%, 90% and Issue for Bid (IFB)). The contract shall be on a Cost-Plus Fixed Fee basis. Request for Qualifications (URL) 169th St Project Detail Map (URL) Publication Date/Time: 8/14/2025 12:00 AM Publication Information: Everett Herald & DJC & OMWBE: 1st Pub 8/14/25; 2nd Pub 8/21/25 Closing Date/Time: 8/28/2025 2:00 PM Submittal Information: 154 W Cox Ave, Arlington WA 98223 Bid Opening Information: No Public Bid Opening Contact Person: Linda Taylor ltaylor@arlingtonwa.gov 360-403-3526 Business Hours: 7:30 AM to 4:00 PM Qualifications: QUALIFICATION REQUIREMENTS City evaluation team will score, and rank SOQ based on the following criteria: • Team Composition and Key Personnel: Scoring will look at firms included in the Consultant’s project team, the qualifications and availability of staff assigned to this project. Consideration will be given to specialized project experience or technical competence relating to the Project Area, and familiarity with work in the north Snohomish County area. This section shall also describe the in-house expertise qualifications. Demonstrate the ability to provide the proposed staff for the full duration of this project and that continuity will be maintained. (25 points) • Project Approach and Schedule: Consultant shall demonstrate a full understanding of the City’s concerns, goals and objectives with this very important project; and how the Consultant’s team will meet these goals in a “Consultant defined” timeline. (25 points) • Experience with Similar Projects: Scoring will evaluate Consultant’s team experience with projects of similar complexity and function. Also included in the evaluation will be past experience with similar federally funded projects and coordination with WSDOT local programs. (20 points) • Completeness of DBE Participation plan: Demonstrate ability to prepare a DBE plan and Good Faith Effort documentation. Evaluation will include complete documentation showing DBE firms are certified to perform the scope of work and any good faith effort documentation is included. (20 points) • Familiarity of Relevant Codes and Standards: Demonstrated understanding of relevant codes (Arlington, FHWA, AASHTO, and WSDOT) and ability to coordinate projects with jurisdictional agencies and multidisciplinary projects. (10 points) Special Requirements: DBE Goals The city has applied the criteria and established a nineteen percent (15%) mandatory DBE firm participation for this project. The consultant shall submit a DBE Participation Plan prior to commencing work on the Agreement. Related Documents: 169th St Project Detail Map (URL) Return To Main Bid Postings Page (URL) Live Edit URL Notify Me URL Service Request URL Pay Online URL Agendas & Minutes URL Public Notices URL Permits URL Contact Us URL Popular Pages URL Employment URL View Meetings URL Arlington School District URL Stilly Valley Chamber of Commerce URL Byrnes Performing Arts Center URL Cascade Valley Hospital URL Downtown Arlington Business Association URL Helpful Links URL Home URL Site Map URL Contact Us URL Accessibility URL Copyright Notices URL Employee Access URL Public Records URL Government Websites by CivicPlus URL
Important Dates
Publication Date
8/14/2025
Closing Date
8/28/2025
Timeline
Publication Date8/14/2025
Closing date8/28/2025
Bid OpeningTBD
Location
169th St Connector corridor between Smokey Point Blvd (west) and 43rd Ave NE / 168th St NE (east), Arlington, WA
Arlington, Snohomish County, WA
Submission Requirements
Submit qualifications statement (SOQ) per RFQ; DBE Participation Plan; prepare and submit as specified in RFQ documents; Submittal Information: 154 W Cox Ave, Arlington WA 98223
Submission Deadline: 8/28/2025
Eligibility Criteria
Qualification criteria include: Team Composition and Key Personnel (25 points); Project Approach and Schedule (25 points); Experience with Similar Projects (20 points); Completeness of DBE Participation plan (20 points); Familiarity of Relevant Codes and Standards (10 points).
Documents
Contact Information
Additional Information
Qualifications
QUALIFICATION REQUIREMENTS City evaluation team will score, and rank SOQ based on the following criteria: • Team Composition and Key Personnel: Scoring will look at firms included in the Consultant’s project team, the qualifications and availability of staff assigned to this project. Consideration will be given to specialized project experience or technical competence relating to the Project Area, and familiarity with work in the north Snohomish County area. This section shall also describe the in-house expertise qualifications. Demonstrate the ability to provide the proposed staff for the full duration of this project and that continuity will be maintained. (25 points) • Project Approach and Schedule: Consultant shall demonstrate a full understanding of the City’s concerns, goals and objectives with this very important project; and how the Consultant’s team will meet these goals in a “Consultant defined” timeline. (25 points) • Experience with Similar Projects: Scoring will evaluate Consultant’s team experience with projects of similar complexity and function. Also included in the evaluation will be past experience with similar federally funded projects and coordination with WSDOT local programs. (20 points) • Completeness of DBE Participation plan: Demonstrate ability to prepare a DBE plan and Good Faith Effort documentation. Evaluation will include complete documentation showing DBE firms are certified to perform the scope of work and any good faith effort documentation is included. (20 points) • Familiarity of Relevant Codes and Standards: Demonstrated understanding of relevant codes (Arlington, FHWA, AASHTO, and WSDOT) and ability to coordinate projects with jurisdictional agencies and multidisciplinary projects. (10 points)
Special Requirements
DBE Goals The city has applied the criteria and established a nineteen percent (15%) mandatory DBE firm participation for this project. The consultant shall submit a DBE Participation Plan prior to commencing work on the Agreement.