City of Bothell

PW Shop 1 Demolition

118

Closed

Category

Request for Bids

Description

In general, the work under the PW Shop 1 Demolition project proposes the demolition of an existing building, verification, removal and disposal of hazardous materials found within the existing building including the slab and foundation, utility capping, earthwork, and constructing a new water line. The total estimated cost for this project is in the range of $500,000 to $550,000. The number of working days for Physical Completion of this project is 50. Please contact Brenda O’Neill at 425-471-2135 or email: brenda.oneill@bothellwa.gov for any questions regarding this project. A pre-bid walk through and access to the building will be held at the site on Thursday January 20, 2022 between 10:00am – 12:00noon after which, bidders will be asked to vacate the building. Record of bidder attendance to the pre-bid meeting is mandatory and required for acceptance of the bid proposal. It is recommended that prospective bidders check the Bidders website for schedule revisions or call Public Works at 425-806-6800 one day in advance to confirm the meeting day/venue/time is still as scheduled. The pre-bid meeting will consist of recording Bidder attendance and project introduction at the aforementioned location followed by a site visit to review the building and structures to be demolished.

Important Dates

Publication Date

1/11/2022

Closing Date

1/27/2022

Bid Opening Date

1/27/2022

Timeline

Publication1/11/2022
Pre-bid Meeting1/20/2022
Addendum 1 Release1/25/2022
Closing date1/27/2022
Bid Opening1/27/2022

Location

Bothell, WA

Submission Requirements

Record of bidder attendance to the pre-bid meeting is mandatory and required for acceptance of the bid proposal. Submittal Information: Bothell City Hall, 18415 101st Ave NE. Bid Opening Information: 2:00 PM 01/27/2022.

Submission Deadline: 1/27/2022

Contact Information

Contact Person

Brenda O'Neill

brenda.oneill@bothellwa.gov

425-471-2135

Additional Information

Publication Information

Publication Date/Time: 1/11/2022 12:00 AM; Publication Information: Daily Journal of Commerce & Seattle Times

Pre-bid Meeting

Pre-bid meeting: January 20, 2022, 10:00 AM - 12:00 PM at the site; attendance mandatory

Plan & Specs Availability

Plans & specs are available for download at Builders Exchange (www.bxwa.com), in the Related Documents section below, or at the OneDrive link: PW Shop 1 Demolition Plans & Specs