Project Description The work to be performed by the CONSULTANT consists of construction administration and office engineering, construction field inspection, and material testing for one (1) tied bids project that includes the Bothell Everett Highway Overlay Project and the 228TH ST SE Overlay Project. This tied bid project has a 19% DBE goal. The major features of the project are as follows: Grind and overlay curb to curb, Intersection channelization, ADA required sidewalk ramps, and Pedestrian push buttons.
Important Dates
Publication Date
4/4/2023
Closing Date
4/25/2023
Timeline
Publication date4/4/2023
Closing date4/25/2023
Location
Bothell Everett Highway & 228th St SE Overlay Project, Bothell, WA
Bothell, WA
Submission Requirements
Work to be performed by the CONSULTANT includes construction administration and office engineering, construction field inspection, and material testing for one tied bid project (Bothell Everett Highway Overlay Project and the 228th St SE Overlay Project). The project has a 19% DBE goal.
Submission Deadline: 4/25/2023
Contact Information
Additional Information
DBE Goal
This tied bid project has a 19% DBE goal.
Publication Information
Publication Date/Time: 4/4/2023 12:00 AM; Publication Information: The Seattle Times ; Seattle Daily Journal of Commerce