City of Bothell

NE 184 Pl & Cambria Hills Water Main Replacement Project / NE 185 St Sewer Repair Project

36

Closed

Category

Request for Bids

Description

Notice is hereby given that the City of Bothell will receive sealed bids for the following construction project. Bids will be received by the receptionist inside City Hall Office Building, located at 18415 101st Ave. NE, (425) 806-6100, in the City of Bothell, Washington up to the hour of 2:00 pm, as determined by the designated bid clock at said location, on Friday, November 17, 2017, after all bids will be publicly opened and read to determine the apparent lowest bidder. The NE 184th Place & Cambria Hills Water Main Replacement Project proposes to replace existing AC water main between NE 184th Place and 92nd Ave NE and to connect existing water mains on NE 204th Place within the Cambria Hills Development. The general aspects of the work on NE 184th Place will involve replacement of approximately 290 linear feet of 8-inch AC water main with 10-inch HDPE water main using the Horizontal Directional Drill (HDD) construction method including installation of water appurtenances, water connections, traffic control, construction surveying, and project restoration. The general aspects of the work within the Cambria Hills Development will involve installation of approximately 160 linear feet of 8-inch DI water main including installation of water appurtenances, water connections, traffic control, construction surveying, and project restoration. The total estimated cost for NE 184th Place is in the range of $125,000 to $145,000 and the total estimated cost for Cambria Hills is in the range of $55,000 to $75,000. Physical completion of NE 184th Place shall be achieved in 20 working days. Physical completion of Cambria Hills shall be achieved in 20 working days. The NE 185th Street Sewer Repair Project proposes to replace two sections of existing sanitary sewer pipe between Beardslee Boulevard and NE 185th Street, near the US Post Office building in Bothell, WA. The first section includes replacement of approximately 13 feet of 8-inch sewer pipe in NE 185th Street in order to repair offset pipe segments. The second section includes abandonment and relocation of approximately 100 feet of 8-inch sewer pipe behind and adjacent to the post office in order to correct adverse slopes. The total estimated cost for this project is in the range of $90,000 to $100,000. Physical completion of NE 185th Street shall be achieved in 20 working days.

Important Dates

Publication Date

11/2/2017

Closing Date

11/17/2017

Bid Opening Date

11/17/2017

Timeline

Closing date11/17/2017
Publication date11/2/2017
Bid Opening11/17/2017

Location

18415 101st Ave NE, Bothell, WA 98011

Bothell, WA

Submission Requirements

Sealed bids; bids received by receptionist inside City Hall Office Building; deadline 2:00 PM local time on 2017-11-17; locations: Bothell City Hall

Submission Deadline: 11/17/2017

Contact Information

Senior Engineering Tech

Peter Pearson

peter.pearson@bothellwa.gov

425-806-6786

Additional Information

Publication Information

Publication Date/Time: 11/2/2017 12:00 AM; Publication Information: Seattle Times, Seattle Daily Journal of Commerce

Closing Date/Time

11/17/2017 2:00 PM

Plan & Spec Available

Builders Exchange; View Plans and Specs at www.BXWA.com (Builders Exchange)

Related Documents

NE 184 Cambria Hills Water Main Bid Tab - FINAL (https://www.bothellwa.gov/DocumentCenter/View/5771)