The Westhill Outfall Rehabilitation Project proposes to install ±220 LF of 30-inch and 36-inch storm drainage pipe through a segmental slip-lining process, installation of a new 60-inch diameter type-II catch basin and connections to an existing structure. The project also includes clearing and grubbing, pedestrian traffic control, construction surveying, bypass pumping, and project restoration. The total estimated cost for this project is in the range of $140,000-$170,000. The number of working days for Physical Completion of this project is 30 working days.

Important Dates

Publication Date

2/5/2018

Closing Date

2/26/2018

Bid Opening Date

2/26/2018

Timeline

Publication date2/5/2018
Closing date2/26/2018
Bid opening date2/26/2018

Location

Submission Requirements

Submittal Information: City Hall Reception, 18415 101st Ave NE, Bothell, WA 98011

Submission Deadline: 2/26/2018

Contact Information

Project Engineer

Yongqing Zhu, P.E.

yongqing.zhu@bothellwa.gov

425-806-6830

Additional Information

Publication Information

Publication Date/Time: 2/5/2018 12:00 AM; Publication Information: Seattle Times & Seattle Daily Journal of Commerce, 2/5 & 2/12/2018

Submittal Location

Submittal Information: City Hall Reception, 18415 101st Ave NE, Bothell, WA 98011

Plan & Spec URL

Builders Exchange: http://www.bxwa.com

Related Documents

Bid Tab - Westhill Outfall Rehabilitation Project (https://www.bothellwa.gov/DocumentCenter/View/6383)