City of Bothell
19th Ave SE Non-Motorized Improvements
72
Category
Request for Bids
Description
The 19th Ave SE/232nd St SE/23rd Ave SE Non-Motorized Improvements propose to install the following improvements along the west side of 19th Ave SE: storm drainage system and quality improvements, roadway widening including new curb, sidewalk, bike lane, retaining walls, precast concrete boardwalk, pedestrian traffic flow and ADA accessibility improvements. Proposed improvements along the north side of 232nd St SE include: storm drainage system and quality improvements, new curb, sidewalk, crosswalk striping and ADA accessibility improvements. Proposed improvements along the east side of 23rd Ave SE include: a storm drainage system improvements, water main improvements, roadway widening including curb, sidewalk, planter, bike lane, retaining walls, complete striping replacement, plus ADA curb ramps and crosswalk improvements. The project also includes traffic control, construction surveying, and project restoration including landscaping and driveway replacement. The total estimated cost for this project is in the range of $2,200,000 to $2,400,000. The number of working days for Physical Completion of this project is 100. Please contact Yongqing Zhu, P.E at (425) 806-6830 for any questions regarding this project.
Important Dates
Publication Date
2/21/2019
Closing Date
3/14/2019
Timeline
Publication date2/21/2019
Closing date3/14/2019
Addendum No. 1 Date3/6/2019
Bid OpeningTBD
Location
West side of 19th Ave SE; north side of 232nd St SE; east side of 23rd Ave SE, Bothell, WA
Bothell, WA
Submission Requirements
Bid documents and plans & specs are available via Builders Exchange (Plan Center of Record) and OneDrive link provided in the bid posting.
Submission Deadline: 3/14/2019
Documents
Contact Information
P.E.
Yongqing Zhu
(425) 806-6830
Additional Information
Plan & Spec Availability
Builders Exchange is the City of Bothell Plan Center of Record and available in OneDrive. Link: https://cityofbothell-my.sharepoint.com/:f:/g/personal/denise_mccormack_bothellwa_gov/EvHK6JX7BT5GsBMnFZ8KWU4BNdLrtIWoZy-a7j8sLIyNjQ?e=JLOgoS
Related Documents
19th Non-Mortorized Improvements_Plan (https://www.bothellwa.gov/DocumentCenter/View/8509); 19th Non-Mortorized Improvements_Specification (https://www.bothellwa.gov/DocumentCenter/View/8508); AD FOR BIDS 2-21 2-28 (https://www.bothellwa.gov/DocumentCenter/View/8507); Addendum_1_19th Non-Motorized_Improvements (https://www.bothellwa.gov/DocumentCenter/View/8584); 19th Ave Non-Motorized_Addendum No.2 (https://www.bothellwa.gov/DocumentCenter/View/8597); Bidder Inquires_March 12 (https://www.bothellwa.gov/DocumentCenter/View/8598); 19th Ave Non-Motorized_Addendum No.3 (https://www.bothellwa.gov/DocumentCenter/View/8601); 19th Ave SE Non-Motorized Improvements_Bid Tab (https://www.bothellwa.gov/DocumentCenter/View/8617)