City of Bothell

Sanitary Sewer Main Repairs Project: Westhill and Beardslee/Sunrise

79

Closed

Category

Request for Bids

Description

The Sanitary Sewer Main Repairs Project: Westhill and Beardslee/Sunrise Areas Project proposes to rehabiliate existing santiary sewer mains with ultraviolet-cured cured in place pipe (CIPP) lining. The general aspects of this work will involve lining 3,921 linear feet of sanitary sewer pipe with CIPP liner in three areas. Areas A and B are multiple segments located primarily in backyards, with limited right of way access. Area C is a single segment located entirely in the right of way. The total estimated cost for this project, not including sales tax, is in the range of $690,000 to $720,000. The number of working days for Physical Completion of this project is 40. Please contact Khin Gyi at Khin.Gyi@Bothellwa.gov or (425) 806-6826 for any questions regarding this project. OneDrive link to download project plans and specs (https://cityofbothell-my.sharepoint.com/:f:/g/personal/tondi_rainey_bothellwa_gov/ElXckUIpUm9OuhSfnqvWHQcBkm2cpMQYmgQICuWDB7doBA?e=ddRl4n)

Important Dates

Publication Date

5/31/2019

Closing Date

6/21/2019

Bid Opening Date

6/21/2019

Timeline

Publication date5/31/2019
Closing date6/21/2019
Bid Opening6/21/2019

Location

Bothell, WA

Submission Requirements

Submittal Information: Bothell City Hall, 18415 101st Ave. NE, Bothell, WA 98011

Submission Deadline: 6/21/2019

Contact Information

Project Contact

Khin Gyi

khin.gyi@bothellwa.gov

(425) 806-6826

Additional Information

Plan & Spec Availability

Builders Exchange (www.bxwa.com) or OneDrive link in Description above

Related Documents

Sanitary Sewer Main Repairs Contract Provisions; Plans; Bidder Inquiries - 2019 Sanitary Sewer Repairs; Final Bid Tab