City of Bothell

NE 188th Street Non-Motorized Improvements

88

Closed

Category

Request for Bids

Description

The NE 188th Street Non-Motorized Improvements proposes to construct sidewalk and bicycle lanes to complete gaps in the existing pedestrian/bicycle facilities along NE 188th Street between 92nd Avenue NE and Bothell Way. The general aspects of this work will involve the installation of approximately 1,300-lf of curb and gutter, sidewalk, planter strip, storm drainage, retaining walls, and pedestrian railings between 92nd Avenue NE and Pop Keeney Stadium; and the installation of 5-ft bike lanes both directions between 92nd Avenue NE and Bothell Way. Improvements will also include installation of ADA compliant curb ramps and crossing enhancements at the intersections of NE 188th Street with 92nd Avenue NE and 95th Avenue NE, the installation of speed feedback signs, and a new mid-block crossing near Pop Keeney Stadium. The total estimated cost for this project (Base Bid Work) is in the range of $1,800,000 to $2,100,000. The number of working days for Physical Completion of this project is one hundred (100) working days for Base Bid Work. Click here to download Plans & Specs from OneDrive (https://cityofbothell-my.sharepoint.com/:f:/g/personal/tondi_rainey_bothellwa_gov/EjLpXEL1GXZPtAbne8HaBWYBs22JtOyJO2wePixMgUrCsQ?e=7Eg7xe), or see Related Documents section below

Important Dates

Publication Date

9/26/2019

Closing Date

10/17/2019

Bid Opening Date

10/17/2019

Timeline

Publication date9/26/2019
Closing date10/17/2019
Bid opening date10/17/2019

Location

NE 188th Street between 92nd Avenue NE and Bothell Way

Bothell, WA

Submission Requirements

Submittal Information: Bothell City Hall, 18415 101st Ave. NE, Bothell, WA 98011

Submission Deadline: 10/17/2019

Contact Information

Bid Contact

Lauren Freist

lauren.freist@bothellwa.gov

(425) 806-6827

Additional Information

Plan &Specs Availability

Click here to download Plans & Specs from OneDrive: https://cityofbothell-my.sharepoint.com/:f:/g/personal/tondi_rainey_bothellwa_gov/EjLpXEL1GXZPtAbne8HaBWYBs22JtOyJO2wePixMgUrCsQ?e=7Eg7xe

Related Documents

NE 188th Street Contract Provisions and Specifications (https://www.bothellwa.gov/DocumentCenter/View/10020); NE 188th Street Plans (https://www.bothellwa.gov/DocumentCenter/View/10021); Addendum 1 - NE 188th NMI (https://www.bothellwa.gov/DocumentCenter/View/10076); Addendum 2 - NE 188th NMI (https://www.bothellwa.gov/DocumentCenter/View/10084); NE 188th Street Bid Opening Summary (https://www.bothellwa.gov/DocumentCenter/View/10090); Bid Tab - NE 188th St Non-Motorized Improvements (PDF) (https://www.bothellwa.gov/DocumentCenter/View/10153)

Publication Information

Publication Date/Time: 9/26/2019 12:00 AM; Publication Information: Seattle Times and Daily Journal of Commerce