The 2019 Storm Repair Project proposes to repair and replace storm drainage pipe and structures along Juanita-Woodinville Way NE, NE 160th St and 228th St SW in the City of Bothell. Work items include catch basin removal and replacement, frame and grate replacement, storm pipe repair using pipe coupler bands, storm pipe replacement, new catch basin installation with connection to existing system, HMA pavement patching, sidewalk replacement, curb and gutter replacement, temporary and permanent pavement markings and traffic control. The total estimated cost for this project is in the range of $306,000 to $374,000. The number of working days for Physical Completion of this project is 40. Please contact Brenda O’Neill at brenda.oneill@bothellwa.gov () for any questions regarding this project. Click here to download plans and specs from OneDrive

Important Dates

Publication Date

1/30/2020

Closing Date

2/20/2020

Bid Opening Date

2/20/2020

Timeline

Publication date1/30/2020
Addendum date2/12/2020
Closing date2/20/2020
Bid opening date2/20/2020

Location

Juanita-Woodinville Way NE; NE 160th St; 228th St SW, City of Bothell, WA

Bothell, WA

Submission Requirements

Submittal Information: Bothell City Hall, 18415 101st Ave. NE, Bothell, WA 98011

Submission Deadline: 2/20/2020