City of Bremerton
Puget Sound Navy Museum Indoor Climate Control Systems
142
Category
Public Works & Utilities
Description
Work to include, but not limited to, supply and installation of climate control equipment, electric steam humidifiers, fan coil and condenser units, integrated mechanical controls, duct demolition, installations, dampers, vent louvers, modifications and other required work as shown on the Puget Sound Navy Museum Indoor Climate Control System plan sets, equipment schedules, general notes, mechanical scope of work and special conditions related to this project. Air balance checks before and after installations, adjustments, start up testing, operational training, plumbing, electrical and controls as specified, and all other associated work as required for a complete and functional climate control system.
Important Dates
Publication Date
4/6/2023
Closing Date
5/3/2023
Timeline
Publication date4/6/2023
Closing date5/3/2023
Location
Bremerton, WA
Submission Requirements
Work to include, but not limited to, supply and installation of climate control equipment, electric steam humidifiers, fan coil and condenser units, integrated mechanical controls, duct demolition, installations, dampers, vent louvers, modifications and other required work as shown on the Puget Sound Navy Museum Indoor Climate Control System plan sets, equipment schedules, general notes, mechanical scope of work and special conditions related to this project. Air balance checks before and after installations, adjustments, start up testing, operational training, plumbing, electrical and controls as specified, and all other associated work as required for a complete and functional climate control system.
Submission Deadline: 5/3/2023