Description

Work to include, but not limited to, installation of specified City of Bremerton purchased HVAC equipment and components for heating and cooling capabilities, as well as a dedicated outside air system and piping and duct demolition, installations, dampers, vent louvers, modifications and other required work as shown on the Bremerton Library Building HVAC System plan sets, equipment schedules, general notes, mechanical scope of work and special conditions related to this project. Air balance checks to be provided after installations, adjustments, start up testing, operational training, plumbing, electrical and controls as specified, and all other associated work as required for a complete and functional HVAC system with a dedicated outside air system.

Important Dates

Publication Date

5/30/2023

Closing Date

6/22/2023

Timeline

Publication date5/30/2023
Closing date6/22/2023

Location

Bremerton Library

Bremerton, WA

Submission Requirements

Installation of City of Bremerton purchased HVAC equipment and components, dedicated outside air system, piping and duct demolition, installations, dampers, vent louvers, modifications and other required work as shown on the project plans; air balance checks after installations; adjustments; start-up testing; operational training; plumbing; electrical and controls as specified; all other required work for a complete and functional HVAC system with a dedicated outside air system.

Submission Deadline: 6/22/2023

Contact Information

Contact Person

Chris Mottner

Chris.Mottner@ci.bremerton.wa.us

(360) 473-2316

Additional Information

Publication Date/Time

5/30/2023 12:00 AM

Closing Date/Time

6/22/2023 10:00 AM

Related Documents

Notice Inviting Bids - Bremerton Library Building HVAC Systems Project (PDF); Bid Tabulation - Bremerton Library Building HVAC Systems Project (PDF)