City of Bremerton

East 9th Street Stormwater Improvements

154

Closed

Category

Public Works & Utilities

Description

The East 9th Street Stormwater Improvements project will address stormwater capacity issues in the existing stormwater network in the lower Manette neighborhood in Bremerton. Stormwater will be diverted from an undersized (12 inch) stormwater outfall located at the west end of E 11th Street to the existing 6 inch outfall at East 9th Street. The 6 inch outfall will be upsized and replaced to accommodate the additional flow. The project will also assess the downstream capacity of the existing conveyance system receiving stormwater from Perry Avenue south of 10th Street. If needed, excess flows will be rerouted to the new East 9th Street outfall.

Important Dates

Publication Date

8/10/2023

Closing Date

8/31/2023

Timeline

Publication date8/10/2023
Closing date8/31/2023

Location

East 9th Street Stormwater Improvements, Bremerton, WA

Bremerton, WA

Submission Requirements

Contact Information

P.E., Stormwater Project Manager

David Dinkuhn

david.dinkuhn@ci.bremerton.wa.us

(360) 471-3917

Additional Information

Related Documents

Request for Proposal - East 9th Street (PDF): https://www.bremertonwa.gov/DocumentCenter/View/10638; East 9th Street Stormwater Improvements - Stormwater Concept (PDF): https://www.bremertonwa.gov/DocumentCenter/View/10640; East 9th Street Stormwater Improvements - Current Professional Services Agreement (PDF): https://www.bremertonwa.gov/DocumentCenter/View/10639; E 11th and Perry_Drainage Report-Revised Final (PDF): https://www.bremertonwa.gov/DocumentCenter/View/10675

Main Bid Postings Page

Return To Main Bid Postings Page: https://www.bremertonwa.gov/bids.aspx