City of Bremerton

Pine Road Basin Stormwater Improvements Marine Impact Basin Project

167

Closed

Category

Public Works & Utilities

Description

This Contract provides for the replacement of the stormwater energy dissipator structure, beach restoration, and landscape and pavement restoration. Work includes installation and maintenance of erosion and sediment controls; flow bypassing; marine water management; excavation and temporary shoring; sawcutting, removal, repair, and installation of asphalt pavements; planting; and temporary traffic control all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications.Engineer’s Estimate range for this project is $800,000 to $1,000,000. All work shall be performed in accordance with the Contract Plans, these Contract Provisions, and the latest edition of the WSDOT/APWA Standard Specifications.

Important Dates

Publication Date

1/5/2024

Closing Date

1/30/2024

Timeline

Publication date1/5/2024
Closing date1/30/2024

Location

Submission Requirements

Not specified in text

Submission Deadline: 1/30/2024

Contact Information

PE

David Dinkuhn

david.dinkuhn@ci.bremerton.wa.us

(360) 473-5331

Additional Information

Engineer’s Estimate

Engineer’s Estimate range for this project is $800,000 to $1,000,000.

Publication & Closing Dates

Publication Date/Time: 2024-01-05T00:00:00Z; Closing Date/Time: 2024-01-30T11:00:00Z