City of Bremerton
Pine Road Basin Stormwater Improvements Marine Impact Basin Project
167
Category
Public Works & Utilities
Description
This Contract provides for the replacement of the stormwater energy dissipator structure, beach restoration, and landscape and pavement restoration. Work includes installation and maintenance of erosion and sediment controls; flow bypassing; marine water management; excavation and temporary shoring; sawcutting, removal, repair, and installation of asphalt pavements; planting; and temporary traffic control all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications.Engineer’s Estimate range for this project is $800,000 to $1,000,000. All work shall be performed in accordance with the Contract Plans, these Contract Provisions, and the latest edition of the WSDOT/APWA Standard Specifications.
Important Dates
Publication Date
1/5/2024
Closing Date
1/30/2024
Timeline
Publication date1/5/2024
Closing date1/30/2024
Location
Submission Requirements
Not specified in text
Submission Deadline: 1/30/2024
Documents
Contact Information
Additional Information
Engineer’s Estimate
Engineer’s Estimate range for this project is $800,000 to $1,000,000.
Publication & Closing Dates
Publication Date/Time: 2024-01-05T00:00:00Z; Closing Date/Time: 2024-01-30T11:00:00Z