City of Bremerton

Reservoir 17 - Interior Coating Replacement

172

Closed

Category

Public Works & Utilities

Description

DESCRIPTION OF WORK: The Work includes all labor, equipment, and materials necessary to recoat the entire interior of a one-million-gallon steel welded, above ground potable water reservoir. Reservoir dimensions are 95 feet diameter and 18.5 - feet height. Reservoir 17 is located at 400 Ridge Lane NE in Bremerton. Access to the site is heading east on NE Vena St, and then converting to a gravel access road to facility gate. The Work includes setting up and maintaining scaffolding and a environmental control system, cutting a door panel if needed, rewelding and coating the door panel, abrasive blasting to near white metal (SSPC-SP 10), recoating all interior surfaces, cleaning and disinfecting the interior in preparation for putting the reservoir back on-line, site cleanup, and proper disposal of all spent materials and coatings all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications.Clean the exterior and spot repair the coating of multiple steel potable water reservoirs located at different sites. The reservoirs are owned, maintained, an operated by the City of Bremerton.

Important Dates

Publication Date

4/17/2024

Closing Date

5/7/2024

Timeline

Publication date4/17/2024
Closing date5/7/2024

Location

400 Ridge Lane NE, Bremerton, WA

Bremerton, WA

Submission Requirements

All communications related to the project shall be directed to the City prior to opening of Bids

Submission Deadline: 5/7/2024

Contact Information

Bid Contact

Rachel Kocha

Rachel.Kocha@ci.bremerton.wa.us

(360) 473-2324

Additional Information

Site details

One-million-gallon steel welded, above ground potable water reservoir; 95 feet diameter; 18.5 - feet height. Reservoir 17 is located at 400 Ridge Lane NE in Bremerton. Access to the site is heading east on NE Vena St, and then converting to a gravel access road to facility gate.

Work scope

The Work includes setting up and maintaining scaffolding and a environmental control system, cutting a door panel if needed, rewelding and coating the door panel, abrasive blasting to near white metal (SSPC-SP 10), recoating all interior surfaces, cleaning and disinfecting the interior in preparation for putting the reservoir back on-line, site cleanup, and proper disposal of all spent materials and coatings all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications.

Owner/Operator

The reservoirs are owned, maintained, an operated by the City of Bremerton.

Publication/Closing

Publication Date/Time: 2024-04-17 12:00 AM; Closing Date/Time: 2024-05-07 11:00 AM

Related Documents

Notice Inviting Bids - Reservoir 17 Interior Coating Replacement (PDF); Res 15 drone photos - March 2024 (PDF); Res 16 Drone Footage - March 2024 (PDF); Res 17 (PDF); Res 20 (PDF); Res 21 Drone Footage - March 2024 (PDF); Res 23 Drone Footage - March 2024 (PDF); Res 10N (PDF); Res 10S (PDF)