6th Street Preservation Phase III - Material Testing RFQ
185
Category
Public Works & Utilities
Description
The work to be performed by the CONSULTANT consists of sampling and testing materials for improvements to the following project: 6th Street Preservation Phase III. The WORK to be completed under this Contract consists of asphalt pavement repair, asphalt planing, fiber reinforced HMA pavement overlay, ADA ramps demolition and reconstruction, installation of new water main line with service connection, abandonment of existing water main, stormwater system modifications, combined sewer overflow separation, demolition of existing and installation of a new traffic signal with vehicle detection systems, pavement marking, signing and traffic control.
Important Dates
Publication Date
10/17/2024
Closing Date
11/7/2024
Timeline
Publication date10/17/2024
Closing date11/7/2024