The work performed by the CONSULTANT consists of preparing preliminary engineering (PE) design for removal of a fish passage barrier culvert on Parish Creek at W Belfair Valley Road. The proposed improvements include removal of an existing 48-inch corrugated metal pipe (CMP) culvert, removal of a concrete spillway, construction of a two-lane bridge, and restoration of approximately 130 feet of Parish Creek using engineered streambed sediments and large woody material (LWM).

Important Dates

Publication Date

12/2/2024

Closing Date

12/20/2024

Timeline

Publication date12/2/2024
Closing date12/20/2024
Bid opening dateTBD

Location

Submission Requirements

Contact Information

Project Manager

David Dinkuhn

david.dinkuhn@ci.bremerton.wa.us