City of Bremerton

Systemic Pedestrian Treatment Rectangular Rapid Flashing Beacons

200

Closed

Category

Public Works & Utilities

Description

The WORK to be completed under this Contract consists of cement concrete sidewalk demolition, ADA concrete curb ramps, concrete curb and gutter, sidewalk, HMA pavement removal and replacement, pavement markings, permanent signing, solar-powered RRFB poles, pole foundations, pedestrian pushbutton assembly, pedestrian pushbutton poles, and traffic control.

Important Dates

Publication Date

8/25/2025

Closing Date

9/16/2025

Timeline

Publication date8/25/2025
Closing date9/16/2025

Location

Submission Requirements

Contact Information

Contact Engineer

Chris Dimmitt, P.E.

Christopher.Dimmitt@ci.bremerton.wa.us

(360) 473-2307

Additional Information

Related Documents

Notice of Inviting Bids - Systemic Pedestrian Treatment Rectangular Rapid Flashing Beacons (PDF) URL: https://www.bremertonwa.gov/DocumentCenter/View/12796