City of Seattle

26-015QP - AAC Roosevelt Pinehurst Way NE Project Construction (FHWA)

26-015QP

Open

Department

Department of Transportation

Adiam Emery - Interim Director

Summary

Project Description: The City of Seattle, through Seattle Department of Transportation (SDOT), requests Statements of Qualifications, with the goal of hiring for the following key staff:1 full time Resident Engineer, 2 full time Construction Inspectors, ¾ time Change Order/Scheduling specialist, ½ time Office Engineer, ½ Doc Control/Contract Admin, and 1 part time Outreach support to provide Construction Management (CM) services on the AAC Roosevelt Pinehurst Way NE project, as part of the overall CM team managing the construction contract for the project.AAC Roosevelt Pinehurst Way NE The AAC Roosevelt Pinehurst Way NE Project is pavement preservation work (a 2" asphalt mill & overlay) on Roosevelt Way and Pinehurst Way NE between NE 92nd St and 15th Ave NE. This pavement preservation project (a mill & overlay) is intended to extend the life of the existing pavement structure by 10 to 20 years. The project was awarded an $8.7M PSRC preservation grant. Scope of AAC work is typical of completed projects. Base repairs, ADA curb ramps, Stormwater Code mandated drainage improvements, striping & signal loop restoration, and the final surfacing course will all be covered by AAC. Additional improvements and funding for those will be identified during the Complete Streets planning process.Construction Contract InformationEstimated construction contract value: $11 millionEstimated pre-construction services (contract document review): December 2026Estimated construction duration: December 2026 – January 2028Estimated construction closeout: January 2028 – June 2028Work will be accomplished in accordance with the FHWA reviewed project Plans and Specifications advertised for construction.For additional project information, please see the project website:Roosevelt and Pinehurst Way NE Paving & Safety Project - Transportation | seattle.gov The successful initiation and completion of this project are contingent on receiving federal funding. The Seattle Department of Transportation intends to execute the consultant construction management contract in December 2026, and the contract is expected to be completed in January 2028. Completion date may be extended if additional phases are added. Construction closeout is anticipated to last six (6) months. The City anticipates possibly awarding an initial contract amount of $2,200,000 and an initial duration of 2 years. The initial contract value and duration may be increased in varying contract dollar amounts and time. This project is anticipated to be federally funded in part through FHWA, administered in part through the Washington State Department of Transportation, and may be funded through other federal funds or Agencies.

Important Dates

Release Date

7/22/2026

Pre-Proposal Date

7/30/2026

Q&A Deadline

8/12/2026

Proposal Deadline

8/19/2026

Contact Information

Project Contact

Ray Johnson

Office Engineering Manager, Capital Projects Division

ray.johnson@seattle.gov

(206) 255-8850

700 Fifth Ave

Suite 3900

Seattle, WA 98104

Procurement Contact

Rachel Greene

Contracts Specialist

rachel.greene2@seattle.gov

(206) 684-4611

Seattle Municipal Tower, 700 5th Ave, Seattle, WA 98104

Seattle, WA 98104