City of Seattle

Questionnaire

On-Call Structural and Seismic/Disaster Engineering Services

FAS 2026-037

Project Questions

1

Letter of interest (optional)

Type: fileUpload

2

Proof of Legal Business Name (Optional)

Type: fileUpload

Provide a certificate or documentation from the Secretary of State in which you incorporated that shows your company legal name. Many companies use a “Doing Business As” name or nickname in daily business; the City requires the legal name for your company. When preparing all forms below, use the proper company legal name. Your company’s legal name can be verified through the State Corporation Commission in the state in which you were established, which is often located within the Secretary of State’s Office for each state. For the State of Washington, see http://www.secstate.wa.gov/corps/
3

Statement of Qualifications

Type: fileUpload

The Statement Of Qualifications (SOQ) shall not exceed ten (10) pages, excluding the cover page, resumes, and required forms. Submittals shall be formatted as follows:Page Size: 8.5"x11"Minimum 11-point font1-inch marginsSingle spacingPDF Format submitted through OpenGovCharts, tables, and graphics may use a minimum 10-point fontThe SOQ should clearly demonstrate the firm's experience, technical capability, staffing qualifications, and capacity to perform the requested services. Firms should organize their SOQ using section headings in this RFQ.The City reserves the right to excise pages that exceed the limit and will not be considered for evaluation.
4

Minimum Qualifications

Type: longAnswer

This response is mandatory. The determination you have achieved all minimum qualifications is made from this section alone, and therefore, the Evaluation Committee is not obligated to check references or search other materials in your proposal to make this decision.For each Minimum Qualification listed below, please describe how you meet the minimum qualification.Minimum Qualification #1Must be licensed and registered to practice engineering in Washington State and City of Seattle.Minimum Qualification #2Must have experience with current code compliance.Minimum Qualification #3Provide three (3) relevant projects within the last seven (7) years including experience with assessment of new and existing facilities. And one (1) reference from owners or contractors that worked with the consultant on the submitted relevant projects, for a total of three (3) references.
5

Consultant Inclusion Plan

Type: download

Please download the below documents, complete, and upload.
6

Consultant Questionnaire

Type: download

Please download the below document, complete, and upload. Provide information to the extent this information is available. If your response is incomplete or requires further description, the City may request additional information within a specified deadline, or may determine the missing information is immaterial.
7

Contract Modifications

Type: fileUpload

Make requested changes to the Contract language using track changes and upload here.