City of Seattle
Washington Park Arboretum Waterfront Trail Renovation
PW#2022-048
Department
Public Works
Mark Nakagawara - Deputy Division Director
Summary
Project Description: The project renovates a portion of the Waterfront Trail within the Washington Park Arboretum. The scope includes replacing and/or renovating the existing floating and on grade trail segments on Foster Island including site furnishing and plantings. Additive #1 is additional trail construction including construction of a 29 linear foot gangway, a 97 linear foot bridge, and two pile supported concrete platforms. Additive #2 is the construction of an on- grade HDPE pipe supported boardwalk.Engineer's Estimate: Base Bid: $960,000.00, Additive#1: $510,000.00, Additive#2: $1,271,445.00 Project Location: 2300 Arboretum Dr E, Seattle, WA 98112
Important Dates
Release Date
12/17/2025
Pre-Proposal Date
1/8/2026
Q&A Deadline
1/16/2026
Proposal Deadline
1/28/2026
Contact Information
Project Contact
Farhat Kohistani
Assistant, Capital Projects Coord.
(253) 308-6228
300 Elliott Avenue West, Suite 100
Seattle
Seattle, WA 98119
Procurement Contact
Ian Hernandez
Sr. Construction Contracting Specialist
(206) 684-0128
700 5th Ave, Ste 4350
Seattle, WA 98104