City of Seattle

Washington Park Arboretum Waterfront Trail Renovation

PW#2022-048

Open

Department

Public Works

Mark Nakagawara - Deputy Division Director

Summary

Project Description: The project renovates a portion of the Waterfront Trail within the Washington Park Arboretum. The scope includes replacing and/or renovating the existing floating and on grade trail segments on Foster Island including site furnishing and plantings. Additive #1 is additional trail construction including construction of a 29 linear foot gangway, a 97 linear foot bridge, and two pile supported concrete platforms. Additive #2 is the construction of an on- grade HDPE pipe supported boardwalk.Engineer's Estimate: Base Bid: $960,000.00, Additive#1: $510,000.00, Additive#2: $1,271,445.00 Project Location: 2300 Arboretum Dr E, Seattle, WA 98112

Important Dates

Release Date

12/17/2025

Pre-Proposal Date

1/8/2026

Q&A Deadline

1/16/2026

Proposal Deadline

1/28/2026

Contact Information

Project Contact

Farhat Kohistani

Assistant, Capital Projects Coord.

farhat.kohistani@seattle.gov

(253) 308-6228

300 Elliott Avenue West, Suite 100

Seattle

Seattle, WA 98119

Procurement Contact

Ian Hernandez

Sr. Construction Contracting Specialist

ian.hernandez@seattle.gov

(206) 684-0128

700 5th Ave, Ste 4350

Seattle, WA 98104