City of Seattle

A.B. Ernst Park Addition

PW#2023-063

Open

Department

Public Works

Mark Nakagawara - Deputy Division Director

Summary

Project Description: Park addition project incorporating new play area features and revising existing paving to provide an accessible entrance to the Seattle Public Library. Project includes tree vegetation and soil protection; demolition of existing pavement and walls; clearing and grubbing of site; tree removal; site regrading; removal, protection and replacement of existing artwork. Removal and haul of contaminated rubble, vegetation and soil, loading onto trucks or bins to an approved Waste Management facility, truck and bin availability to be coordinated by contractor, soil disposal by others. Import fill; accessible concrete paving; cast-in-place concrete curbs and walls; installation of new play equipment and surfacing; handrails; plantings and site furnishings. New trees, shrubs and vegetation; new storm and irrigation utilities, connections, and appurtenances. This project includes one alternate and two additives: Alternate 1 – Play Pavement Band, Additive 1 – Second Café Table, and Additive 2 – Second Trash and Recycling. Engineer's Estimate: Base Estimate: $760,000.00, Alternate#1: $1,331.00, Additive#1: $3,651.00, Additive#2: $1,956.00.Project Location: 723 N 35th St, Seattle, WA 98103

Important Dates

Release Date

2/12/2026

Pre-Proposal Date

2/18/2026

Q&A Deadline

2/24/2026

Proposal Deadline

3/4/2026

Contact Information

Project Contact

Farhat Kohistani

Assistant, Capital Projects Coord.

farhat.kohistani@seattle.gov

(253) 308-6228

300 Elliott Avenue West, Suite 100

Seattle

Seattle, WA 98119

Procurement Contact

Pamela Honma

Sr. Construction Contracts Specialists

pamela.honma@seattle.gov

(206) 733-9941

700 5th Ave

Seattle, WA 98101