City of Seattle
Holden Natural Drainage System (NDS) (RE-BID)
PW#2024-051 (RE-BID)
Department
Public Works
Mark Nakagawara - Deputy Division Director
Summary
Project Description: This Project will provide water quality treatment for street runoff by retrofitting the roadsides with bioretention treatment systems. This Project consists of the following elements of Work including but not limited to: construction stormwater erosion control (submittal, implementation, and maintenance of the Construction Stormwater Pollution Prevention plans (CSECP/SWPPP, TVSPP, SP, & TDP)); health and safety plan; clearing and grubbing; demolition and removal of existing surface pavement, sidewalks, and curbs; excavation; temporary traffic control plan and implementation, including flagging; site preparation and staging; survey; removal and abandoning existing drainage structures and piping; dewatering; temporary stormwater bypass; protection, relocation, and/or adjustments of existing utilities, including water and gas services; reconnection to the existing drainage system; installation of new surface drainage systems, including storm drainage piping, drainage structures, bioretention cells, and modular structural soil cell tree facilities; flow testing; assist SPU crews with water service and meter box relocations/adjustment; television inspections; and final site restoration, including surface paving, pavement markings, sidewalks, curbs, driveway, curb ramps, final planting, and landscape construction. Engineer's Estimate: $1,178,000.00 Project Location: This Project is located in the City of Seattle (COS) on SW Holden St between 16th Ave SW and 18th Ave SW.
Important Dates
Release Date
4/1/2026
Q&A Deadline
4/17/2026
Proposal Deadline
4/22/2026
Contact Information
Project Contact
Kai Fan
Senior Civil Engineer
(206) 684-5942
700 5th Ave, Suite 4900
P. O. Box 34018
Seattle, WA 98124
Procurement Contact
Gina Owens
Sr. Construction Contracts Specialist
(206) 684-7251
700 5th Avenue, Suite 4350
Seattle, WA 98124