City of Seattle

Meridian Play Area Renovation and ADA Meridian RR Design

PW#2025-037

Open

Department

Public Works

Mark Nakagawara - Deputy Division Director

Summary

Project Description: This project will replace the play area, located in Meridian Park. Renovation includes new play equipment, accessible access to all; site furniture, landscape and updated accessible restroom. This project includes two alternates:Alternate. 1 - Sidewalk paving and replacement in lieu of repair. Sidewalk extends from new. Accessible connection to northeast corner of Good Shepherd center will be demolished and installed as new sidewalk, rather than repaired.Alternate. 2 - EWF in combination with PIP Surfacing. A portion of the EWF Play surfacing will be replaced with Poured-in-Place surfacing and cast in place concrete slab underlay.Engineer's Estimate: $940,347.00; Alternate #1: $82,250.00; Alternate #2: $392,728.00Project Location: 4920 Meridian Ave N, Seattle, WA 98102

Important Dates

Release Date

4/29/2026

Q&A Deadline

5/14/2026

Proposal Deadline

5/20/2026

Contact Information

Project Contact

Fuadi Said

Capital Project Coordinator -Asst.

fuadi.said@seattle.gov

(206) 760-4044

300 Elliott Avenue West

Seattle, WA 98119

Procurement Contact

Gina Owens

Sr. Construction Contracts Specialist

gina.owens@seattle.gov

(206) 684-7251

700 5th Avenue, Suite 4350

Seattle, WA 98124