City of Seattle
Cedar River Sockeye Hatchery Supply Wells
PW#2025-052
Department
Public Works
Mark Nakagawara - Deputy Division Director
Summary
PROJECT LOCATION: This project is located near the Cedar River Sockeye Hatchery within the Cedar River Watershed of the City of Seattle, in Maple Valley, Washington at 28700 S.E. 252nd Place, Ravensdale, WA 98051 behind secured gates. PROJECT DESCRIPTION: This Project consists of the following elements of Work: drilling, constructing and testing three new groundwater supply wells using a reverse-circulation air rotary method with dual rotary or a casing advanced system for the Cedar River Sockeye Hatchery. ESTIMATE: The Engineer's Estimate for this is $1,700,000 (before tax)
Important Dates
Release Date
11/6/2025
Pre-Proposal Date
12/16/2025
Q&A Deadline
1/2/2026
Proposal Deadline
1/7/2026
Contact Information
Project Contact
Mark Fredrickson
Supervising Civil Engineer
(206) 684-7615
700 5th Ave, Suite 4700
Seattle, WA 98124
Procurement Contact
Ian Hernandez
Sr. Construction Contracting Specialist
(206) 684-0128
700 5th Ave, Ste 4350
Seattle, WA 98104