City of Seattle
W Magnolia S PF Lighting Replacements
PW#2025-077
Department
Public Works
Mark Nakagawara - Deputy Division Director
Summary
Project Description: 1. Demolish and haul existing wooden flood light poles to Parks designated park facility, demolish and haul floodlights, leave existing conduit in place. Existing wood poles appear to be treated poles possibly Pentachlorophenol, or Penta Chromated Copper Arsenate, or CCA. This should be confirmed by contractor testing and appropriately disposed of. Refer to 01 74 19 Construction Waste Materials and Disposal and 02 41 13 Selective Site Demolition for the disposal of wooden flood light poles and potentially contaminated soils. 2. Provide new floodlight poles, shielded LED floodlights, conduit, wiring, junction boxes and receptacles. Replace existing electrical panels, provide new circuit breakers, lighting control panel to accommodate new shielded LED floodlights. Tree pruning will be required by the contractor to accommodate lighting operation and installation.Engineer's Estimate: $1,219,433.60Project Location: Magnolia Playfield 2518 34th Ave W, Seattle, WA 98199
Important Dates
Release Date
9/30/2026
Pre-Proposal Date
10/6/2026
Q&A Deadline
10/15/2026
Proposal Deadline
10/21/2026
Contact Information
Project Contact
Fuadi Said
Capital Project Coordinator -Asst.
(206) 760-4044
300 Elliott Avenue West
Seattle, WA 98119
Procurement Contact
Gina Owens
Sr. Construction Contracts Specialist
(206) 684-7251
700 5th Avenue, Suite 4350
Seattle, WA 98124