City of Seattle

Lower Woodland #4 and Fairmount Playground Infield Conversion

PW#2026-012

Open

Department

Public Works

Mark Nakagawara - Deputy Division Director

Summary

Project Description: Both playfield sites are existing unimproved clay/silt infield soil infields, to be converted to synthetic turf surfacing with a supplemental pad underlayment. The work includes excavation, stormwater utilities, subsurface drainage, import bulk aggregates, minor irrigation systems reconfiguration, and site restoration. The Fairmount site includes a stormwater treatment vault. Lower Woodland 4 includes a side-sewer connection. Engineer's Estimate: $1,198,227.00Project Location: Lower Woodland #4: 1000 N 50th St Seattle, WA 98103 and Fairmount Playground Infield Conversion: 5400 Fauntleroy Way SW Seattle, WA 98103

Important Dates

Release Date

8/19/2026

Q&A Deadline

9/9/2026

Proposal Deadline

9/16/2026

Contact Information

Project Contact

Myles Long

Capital Project Coordinator

myles.long@seattle.gov

(206) 255-8943

300 Elliot Ave W

Seattle, WA 98119

Procurement Contact

Ian Hernandez

Sr. Construction Contracting Specialist

ian.hernandez@seattle.gov

(206) 684-0128

700 5th Ave, Ste 4350

Seattle, WA 98104