City of Seattle
Central West Headquarters Electrical Service Relocation
PW#2026-026
Department
Public Works
Mark Nakagawara - Deputy Division Director
Summary
Project Description: Electrical Service Relocation Obtain temporary overhead service from Seattle city light (to allow expedited demolition of existing mast). Demolish existing mast as soon as temporary service is established, Replace existing 240D/120V/3PH/4W/600A service with new. Demolish existing weather head and overhead service. Maintain existing low voltage weather head and service. Install new service mast, weather head, CT, meter, service disconnect and new main distribution panel. Backfeed existing loads from new main distribution board. Provide back-up generator for service shut-down and cut-over in case additional downtime is required. Obtain street use permit from Seattle department of transportation for street crossing.Engineer's Estimate: $221,154.00Project Location: 1403 W Howe St Seattle WA 98119
Important Dates
Release Date
8/12/2026
Q&A Deadline
8/26/2026
Proposal Deadline
9/2/2026
Contact Information
Project Contact
Fuadi Said
Capital Project Coordinator -Asst.
(206) 760-4044
300 Elliott Avenue West
Seattle, WA 98119
Procurement Contact
Pamela Honma
Sr. Construction Contracts Specialists
(206) 733-9941
700 5th Ave
Seattle, WA 98101