Columbia Branch - Historical Carnegie Building Renovation and Seismic Structural Upgrade of Unreinforced Masonry Building (URM)
SPL PW# A&E Seismic 2026-05 COL
Evaluation Criteria
1
There are no minimum qualifications required in order for a consultant to submit a response to this solicitation.
2
The City consultant contract is attached (See Attachments Section).The City has attached its boilerplate contract terms to allow Respondents to be familiar with boilerplate, and the non-negotiable terms before submitting a proposal. The City may negotiate with the highest ranked apparent successful Respondent. The City cannot modify contract provisions mandated by Federal, State or City law: Equal Benefits, Audit (Review of Vendor Records), WMBE and EEO, Confidentiality, and Debarment or mutual indemnification. Exceptions to those provisions will be summarily disregarded.
3
The City consultant contract is attached (See Attachments Section).The City has attached its boilerplate contract terms so Proposers can be familiar with the boilerplate and the non-negotiable terms before submitting a proposal. Any questions about the City’s boilerplate should be made in advance of submittal. If a Consultant seeks to modify the Contract, the Consultant must request that within their Proposal response as taking an “Exception”. The Consultant must provide a revised version that shows their proposed alternative contract language. The City is not obligated to accept such proposed changes. If you request Exceptions that materially change the character of the contract, the City may reject the Consultant’s Proposal as non-responsive. The City cannot modify provisions mandated by Federal, State or City law: Equal Benefits, Audit (Review of Vendor Records), WMBE and EEO, Confidentiality, and Debarment, or mutual indemnification. Such Exceptions would be summarily disregarded.Although the City may open discussions with the highest ranked apparent successful Proposer to align the proposal or contract to best meet City needs, this does not ensure negotiation of modifications proposed by the consultant through the exception process above.
4
Registration into the City's Procurement Portal
If you have not previously done so, register at: https://procurement.opengov.com/portal/seattle, then subscribe to the City’s Procurement Portal. The Procurement Portal is used by City staff to identify companies for future solicitation lists and check certifications. Women- and minority-owned firms are asked to self-identify their business as such in OpenGov. Registration in the City's Procurement Portal is required to submit a response to this solicitation.
5
Protests
Interested parties that wish to protest any aspect of this RFP selection process shall provide written notice to the Procurement Contact. Note the City shall notify Federal Transit Administration if protesting a solicitation for contracts with FTA funds.
6
Procurement Contact: Shawne Anderson, Sr. Buyer, shawne.anderson@spl.org, (206) 684-7917Qualifications are to be submitted through the e-Procurement portal at https://procurement.opengov.com/portal/seattle, no later than 4:00 pm on Wednesday, June 10, 2026.Unless authorized by the Procurement Contact, no other City official or employee may speak for the City regarding this solicitation until award is complete. Any Respondent contacting other City officials or employees does so at Respondent’s own risk. The City is not bound by such information.
7
Minimum qualifications are required for a Consultant to be eligible to submit a proposal response. Your submittal response must show compliance to these minimum qualifications. Those that are not responsive to these qualifications shall be rejected by the Library without further consideration: The consultant firm and its sub consultants must possess demonstrated experience in successfully realizing projects of similar size and type, with expertise in historic landmark and library design and construction. The Consultant firm and its sub consultants must be in good standing with the Library. The consultant Project Manager or consultant team must include: 1. Consultant with a minimum of 8 years continuous experience during which design and engineering services have been the primary business; 2. Consultant with a minimum of 5 years of experience in work involving the successful renovation of historical landmark structures; 3. Consultant with a minimum of 5 years of experience in work involving library programming, design and construction; 4. Consultant must have successfully performed at least three contracts with a public or private agency that included services similar to those expected in this contract; 5. Consultant must have a local office within 150 miles of the greater Seattle area.
8
The Library expects to achieve the following outcomes through this consultant solicitation:SPL seeks a highly qualified architectural and engineering firm with demonstrated expertise in the following areas:Historic Preservation: Experience designing and managing seismic retrofit of historic unreinforced masonry structures consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties and the Seattle Landmarks Preservation Board standards.Structural Engineering: Demonstrated expertise in seismic retrofit of complex masonry buildings, including both historic Carnegie structures and modern concrete additions.Building Envelope Restoration: Experience with historic slate roof replacement, terra cotta restoration, masonry repointing, and copper flashing work on landmark-designated buildings.Public Institutional Projects: Prior experience managing renovation of occupied public facilities such as libraries, community centers, or civic buildings, with demonstrated ability to phase work to minimize service disruptions.Sustainability: LEED-accredited staff and demonstrated experience achieving LEED Silver certification or above on comparable projects.Regulatory Coordination: Proven track record coordinating with DAHP, SHPO, tribal consultation under Section 106, Seattle Landmarks Preservation Board, and the City of Seattle Department of Construction and Inspection.Value Management: A structured approach to value engineering and design-phase cost management to deliver projects on budget and minimize unforeseen-conditions change orders during construction.The selected firm will work collaboratively with SPL staff, the City of Seattle, DAHP, and the Seattle Landmarks Preservation Board. The Library values clear communication, proactive problem-solving, and a shared commitment to delivering this project on schedule.
9
The Columbia Branch Library has served the Columbia City neighborhood since 1915, when the original 6,825 square-foot Carnegie building was constructed with funds from an Andrew Carnegie grant. The building was designed by architects W. Marbury Somervell and Harlan Thomas in Georgian Revival style with brick construction. The branch is listed on the National Register of Historic Places and is a contributing structure in the Columbia City Landmark District.The facility has undergone two significant renovations since its opening: a major remodel in 1986, and a 2004 expansion that added approximately 5,400 square feet, bringing the total to approximately 12,225 square feet. The 2004 addition created the current two-wing configuration and expanded library programming capacity while the original Carnegie wing continues to serve as the historic heart of the branch.A 2016 seismic survey by the Seattle Department of Construction and Inspection identified the Columbia Branch as high-risk for earthquake damage due to its unreinforced masonry (URM) construction. Seismic vulnerabilities exist in both the original 1915 Carnegie structure and the 2004 addition. The structural upgrade is to comply with Damage Control concepts.This seismic renovation is the final phase of a multi-phase renovation. Phase 1 — HVAC electrification and electrical upgrades — will be complete prior to the start of this project. A primary objective of the design is to protect the newly installed HVAC systems and ensure that seismic retrofit and building envelope work does not damage or require rework of Phase 1 improvements. In addition to the seismic upgrade, this project will include building envelope restoration, accessibility improvements, and interior renovation, updating the library to comply with current building and accessibility codes for the City of Seattle, the State of Washington, and the Americans with Disabilities Act.
10
The following performance schedule reflects the Library's intent. All dates are subject to adjustment at the Library's discretion.Programming & Schematic Design: September – December 202630% / 60% / 90% Construction Documents: January – September 2027Permit Set & City of Seattle Review: Concurrent to Programming and Construction Documents100% Construction Documents & Bidding: September – November 2027Construction Mobilization: November – December 2027Seismic Retrofit & Building Envelope Construction: December 2027 – September 2028Accessibility Improvements & Interior Restoration: April – November 2028Punch List & Closeout: November – December 2028Substantial Completion (NLT): December 31, 2028The Library reserves the right to modify this schedule. Changes will be posted on the Library website or as otherwise stated.
11
Initial Screening
The Library will review responses for responsiveness and responsibility. Those found responsive and responsible based on an initial review shall proceed to Step 2. Equal Benefits, Minimum Qualifications, an Inclusion Plan, satisfactory financial responsibility and other elements are screened in this Step. A significant failure to perform on past Library projects may also be considered in determining the responsibility of a firm.
12
The City consultant contract is attached (See Attachments Section).Consultants submit proposals understanding all Contract terms and conditions are mandatory. Response submittal is agreement to the Contract without exception. The City reserves the right to negotiate changes to submitted proposals and to change the City's otherwise mandatory Contract form during negotiations. If the Consultant is awarded a contract and refuses to sign the attached Contract form, the City may reject the Consultant from this and future solicitations for the same work. Under no circumstances shall Consultant submit its own boilerplate of terms and conditions.
13
14
Pre-Submittal Conference
15
Limited Debriefs
The City issues results and award decisions to all Respondents. The City provides debriefing on a limited basis for the purpose of allowing respondents to understand how they may improve in future solicitation opportunities.
16
Qualification Evaluation
The Library will evaluate proposals using the criteria below. Responses will be evaluated, scored and ranked.Evaluation Criteria:Experience & Qualifications 75%Proposed Delivery of Services 10%Inclusion Plan 10%References 5%Interviews (Optional) +10%
17
Interviews
The Library may interview top ranked firms from the proposal evaluation. If interviews are conducted, rankings of firms shall be determined by the Library, using the combined results of interviews and proposal submittals. Consultants invited to interview are to bring the assigned key person(s) named by the Consultant in the Proposal, and may bring other key personnel named in the Proposal. The Consultant shall not bring individuals who do not work for the Consultant or are not on the project team without advance authorization by the Procurement Contact. If interviews are conducted, they will be worth 10% additional points.
18
Questions
Respondents may submit their questions through the Procurement Portal. Respondents may also email questions to the Procurement Contact until the deadline stated in the Timeline. Failure to request clarification of any inadequacy, omission, or conflict will not relieve the Consultant of responsibilities under any subsequent contract. It is the responsibility of the interested Consultant to assure they receive responses to questions if any are issued.
19
Instructions to the Apparently Successful Consultant(s)
The Apparently Successful Consultant(s) will receive an Intent to Award Letter from the Procurement Contact after award decisions are made by the City. The Letter will include instructions for final submittals due prior to execution of the contract.Once the City has finalized and issued the contract for signature, the Consultant must execute the contract and provide all requested documents within ten (10) business days. This includes attaining a Seattle Business License, payment of associated taxes due, and providing proof of insurance. If the Consultant fails to execute the contract with all documents within the ten (10) day time frame, the City may cancel the award and proceed to the next ranked Consultant, or cancel or reissue this solicitation. Cancellation of an award for failure to execute the Contract as attached may disqualify the firm from future solicitations for this same work.
20
Checklist of Requirements Prior to Award
The Consultant(s) should anticipate the Letter will require at least the following. Consultants are encouraged to prepare these documents when possible, to eliminate risks of late compliance.Seattle Business License is current and all taxes due have been paid.State of Washington Business License.Evidence of Insurance (if required)Special Licenses (if any)Form W-9 if a new Consultant for the City
21
Changes to the RFQ
The City may make changes to this RFQ if, in the sole judgment of the City, the change will not compromise the City’s objectives in this solicitation. Any change to this RFQ will be made by formal addendum issued by the City, through the Procurement Portal at https://procurement.opengov.com/portal/seattle and shall become part of this RFQ.
22
References
The Library may contact one or more references. The Library may use references named or not named by the Proposer. The Library may also consider the results of performance evaluations issued by the Library on past projects.
23
Receiving Addenda and/or Question and Answers
It is the obligation and responsibility of the Consultant to learn of addenda, responses, or notices issued by the City, through the Procurement Portal. Some third-party services independently post City of Seattle solicitations on their websites. The City does not guarantee that such services have accurately provided all the information published by the City.All submittals sent to the City may be considered compliant with or without specific confirmation from the Consultant that any and all addenda was received and incorporated into your response. However, the Project Manager reserves the right to reject any submittal that does not fully incorporate Addenda that is critical to the project.
24
Insurance Requirements for Award
25
Selection
The Library shall select the highest ranked Proposer(s) for award, including written proposal and the interview (if applicable). The Library reserves the right to make a final selection based on the combined results and/or the overall consensus of the Consultant Evaluation Committee.
26
Qualifications Submittal
Responses must be received by the City no later than the date and time in the Timeline, except as revised by Addenda. The submitter has full responsibility to ensure the response is submitted to the City's Procurement Portal within the deadline. The Procurement Portal will not allow vendors to upload submissions past the deadline.
27
Contract Negotiations
The highest ranked Proposer will be asked to bring forward a fee schedule and pricing proposal for negotiation and discussion with the Library. The Library may negotiate any aspect of the proposal or the solicitation. The Library cannot modify contract provisions mandated by Federal, State or City law: Equal Benefits, Audit (Review of Vendor records), WMBE and EEO, Confidentiality, Debarment, or mutual indemnification.(See Attachments).
28
Respondent Responsibility to Provide Full Response
It is the Respondent's responsibility to respond in a manner that does not require interpretation or clarification by the City. The Respondent is to provide all requested materials, forms and information. The Respondent is to ensure the materials are submitted properly and accurately reflect the Respondent’s qualifications. During scoring and evaluation (prior to interviews if any), the City will rely upon the submitted materials and shall not accept materials from the Respondent after the RFQ deadline; this does not limit the City’s right to consider additional information (such as references that are not provided by the Respondent but are known to the City, or past City experience with the consultant), or to seek clarifications as needed.
29
Prohibited Contacts
Respondents shall not interfere in any way to discourage other potential and/or prospective consultants from submitting or considering participation in the submittal process. Prohibited contacts includes but is not limited to any contact, whether direct or indirect (i.e. in writing, by phone, email or other, and by the Respondent or another person acting on behalf of the Respondent) to a likely firm or individual that may discourage or limit competition. If such activity is evidenced to the satisfaction and in sole discretion of the City department, the Respondent that initiates such contacts may be rejected from the process.
30
Right to Award to next ranked Consultant
If a contract is executed resulting from this solicitation and is terminated within 90-days, the Library may return to the solicitation process to award to the next highest ranked responsive Consultant by mutual agreement with such Consultant. New awards thereafter are also extended this right.
31
License and Business Tax Requirements
The Consultant must meet all applicable licensing requirements immediately after contract award or the City may reject the Consultant. Companies must license, report and pay revenue taxes for the Washington State business License (UBI#) and Seattle Business License, if required by law. Carefully consider those costs before submitting an offer, as the City will not separately pay or reimburse such costs.Seattle Business Licensing and associated taxesIf you have a “physical nexus” in the city, you must obtain a Seattle Business license and pay all taxes due before the Contract can be signed. A “physical nexus” means you have physical presence, such as: a building/facility/employee(s) in Seattle, you make sales trips into Seattle, your own company drives into Seattle for product deliveries, and/or you conduct service work in Seattle (repair, installation, service, maintenance work, on-site consulting, etc). We provide a Consultant Questionnaire Form in our submittal package items later in this RFP/RFQ, and it will ask you to specify if you have “physical nexus”.All costs for any licenses, permits and Seattle Business License taxes owed shall be borne by the Consultant and not charged separately to the City. The apparent successful Consultant(s) must immediately obtain the license and ensure all City taxes are current, unless exempted by City Code due to reasons such as no physical nexus. Failure to do so will cause rejection of the submittal. The City of Seattle Application for a Business License and additional licensing information can be found this page here: https://www.seattle.gov/city-finance/business-taxes-and-licenses/business-licenses For Questions and Assistance, call the Revenue and Consumer Protection (RCP) office which issues business licenses and enforces licensing requirements. The general e-mail is tax@seattle.gov. The main phone is 206-684-8484. Self-Filing You can pay your license and taxes on-line https://www.filelocal-wa.gov/Default_FileLocal.aspx If a business has extraordinary balances due on their account that would cause undue hardship to the business, the business can contact the License and Tax Administration office at tax@seattle.gov or 206-684-8484 to request additional assistance. Those holding a City of Seattle Business license may be required to report and pay revenue taxes to the City. Such costs should be carefully considered by the Consultant prior to submitting your offer. When allowed by City ordinance, the City will have the right to retain amounts due at the conclusion of a contract by withholding from final invoice payments.
32
Repeat of Evaluation
If no Consultant is selected at the conclusion of all the steps, the Library may return to any step in the process to repeat the evaluation with those proposals active at that step. The Library shall then sequentially step through all remaining steps as if conducting a new evaluation process. The Library reserves the right to terminate the process if no proposals meet its requirements.
33
State Business Licensing
Before the contract is signed, you must have a State of Washington business license (a “Unified Business Identifier” known as a UBI#). If the State of Washington has exempted your business from State licensing (some foreign companies are exempt and sometimes, the State waives licensing because the company has no physical presence in the State), then submit proof of that exemption to the City. All costs for any licenses, permits and associated tax payments due to the State because of licensing shall be borne by the Consultant and not charged separately to the City. Instructions to apply for a business license can be found at https://dor.wa.gov/open-business/apply-business-license and the State of Washington Department of Revenue contact help page at https://dor.wa.gov/contact.
34
Federal Excise Tax
The City is exempt from Federal Excise Tax.
35
No Guaranteed Utilization
The City does not guarantee utilization of any contract(s) awarded through this RFQ process. The solicitation may provide estimates of utilization; such information is for Consultant convenience and not a usage guarantee. The City reserves the right to issue multiple or partial awards, and/or to order work based on City needs. The City may turn to other appropriate contract sources or supplemental contracts to obtain these same or similar services. The City may re-solicit for new additions to the Consultant pool. Use of such supplemental contracts does not limit the right of the City to terminate existing contracts for convenience or cause.
36
Expansion Clause
The contract limits expansion of scope and new work not expressly provided for within the RFQ.Expansion for New Work (work not specified within the original Scope of Work Section of this Agreement, and/or not specified in the original RFQ as intended work for the Agreement) must comply with the following:(a) New Work is not reasonable to solicit separately; (b) is for reasonable purpose; (c) was not reasonably known by the City or Consultant at time of solicitation or was mentioned as a possibility in the solicitation (i.e. future phases of work, or a change in law); (d) is not significant enough to be regarded as an independent body of work; (e) would not attract a different field of competition; and (f) does not change the identity or purpose of the Agreement. The City may make exceptions for immaterial changes, emergency or sole source conditions, or other situations required in City opinion. Certain changes are not subject to these limitations, such as additional phases of Work anticipated during solicitation, time extensions, and Work Orders issued on an On-Call contract. Expansion must be mutually agreed and issued by the City through written Addenda. New Work performed before an authorizing Amendment may not be eligible for payment.The City reserves the right to independently solicit and award any New Work to another firm when deemed appropriate or required by City policy.
37
Effective Dates of Offer
Solicitation responses are valid until the City completes award. Should any Respondent object to this condition, they must object prior to the Q&A deadline in the Timeline.
38
Cost of Preparing Submittals
The City is not liable for costs incurred by the Respondent to prepare, submit and present qualifications, interviews and/or demonstrations.
39
Readability
The City’s ability to evaluate submissions is influenced by the organization, detail, comprehensive material and readable format of the response.
40
Changes or Corrections to Submittal
Prior to the submittal closing date and time established for this RFQ, a Consultant may change or correct its proposal by following the Instructions here: https://opengov.my.site.com/support/s/article/4f4218bf-7da6-4fc6-b0c3-7eade0776ebe. No change to a submission shall be made after the solicitation closing date and time.
41
Errors in Submissions
Respondents are responsible for errors and omissions in their submissions. No error or omission shall diminish the Respondent’s obligations to the City.
42
Withdrawal of Submission
A submittal may be withdrawn at any time through the Procurement portal prior to the closing date or by written request of the submitter.
43
Rejection of Submissions
The City may reject any or all submissions with no penalty. The City may waive immaterial defects and minor irregularities in any submitted response.
44
Incorporation of RFQ and Respondent Submission in Contract
This RFQ and Respondent’s submission, including promises, warranties, commitments, and representations made in the successful response once accepted by the City, are binding and incorporated by reference in the City’s contract with the Respondent.
45
Independent Contractor
46
Equal Benefits
Seattle Municipal Code Chapter 20.45 (SMC 20.45) requires consideration of whether Consultants provide health and benefits that are the same or equivalent to the domestic partners of employees as to spouses of employees, and of their dependents and family members. The Consultant Questionnaire requested in the Response Materials and Submittal section includes materials to designate your equal benefits status.
47
Women and Minority Subcontracting
The Mayor’s Executive Order and City ordinance require the maximum practicable opportunity for successful participation of minority and women-owned subcontracts. All proposers must agree to SMC Chapter 20.42, and seek meaningful subconsultant opportunities with WMBE firms. The City requires a plan for including minority- and women-owned firms, which becomes a material part of the contract. The Plan must be responsive in the opinion of the City, which means a meaningful and successful search and commitments to include WMBE firms for subcontracting work. The City reserves the right to improve the Plan with the winning Consultant before contract execution. Consultants should use selection methods and strategies sufficiently effective for successful WMBE participation. At City request, Consultants must furnish evidence such as copies of agreements with WMBE subconsultants either before contract execution or during contract performance. The winning Consultant must request written approval for changes to the Inclusion Plan once it is agreed upon. This includes changes to goals, subconsultant awards and efforts.WMBE firms need not be state certified to meet the City's WMBE definition. The City defines WMBE firms as at least 51% (percent) owned by women and/or minority. To be recognized as a WMBE, register on the City’s Procurement Portal. Federally funded transportation projects require a Disadvantaged Business Enterprises (DBE) program; for that program, firms must be certified by the Washington State Office of Minority and Women Business Enterprises (OMWBE).
48
Insurance Requirements
Any special insurance requirements are provided as an Attachment. If attached, provide proof of insurance and additional insured endorsement policy language to the City before Contract execution. The apparent successful Proposer must promptly provide proof of insurance to the City upon receipt of the notice of intent to award.Consultants are encouraged to immediately contact their Broker to begin preparation of the required insurance documents, if the Consultant is selected as a finalist. Respondents may elect to provide the requested insurance documents within their Submittal.
49
Proprietary Materials
The State of Washington’s Public Records Act (Release/Disclosure of Public Records): Under Washington State Law (reference RCW Chapter 42.56, the Public Records Act) all materials received or created by the City of Seattle are considered public records. These records include but are not limited to bid or proposal submittals, agreement documents, contract work product, or other bid material. The State of Washington’s Public Records Act requires that public records must be promptly disclosed by the City upon request unless that RCW or another Washington State statute specifically exempts records from disclosure. Exemptions are narrow and explicit and are listed in Washington State Law (Reference RCW 42.56 and RCW 19.108).Respondents must be familiar with the Washington State Public Records Act and the limits of record disclosure exemptions. For more information, visit the Washington State Legislature’s website at http://app.leg.wa.gov/rcw/default.aspx?cite=42.56.If you have any questions about disclosure of the records you submit with your response, contact the Procurement Contact named in this document.Marking Your Records Exempt from Disclosure (Protected, Confidential, or Proprietary)As mentioned above, all City of Seattle offices (“the City”) are required to promptly make public records available upon request. However, under Washington State Law some records or portions of records are considered legally exempt from disclosure and can be withheld. A list and description of records identified as exempt by the Public Records Act can be found in RCW 42.56 and RCW 19.108.If you believe any of the records you are submitting to the City as part of your bid/proposal or contract work products, are exempt from disclosure you can request that they not be released before you receive notification. To do so you must complete the City Non-Disclosure Request Form (“the Form”) provided by the City (see page 4 on the Consultant Questionnaire) and very clearly and specifically identify each record and the exemption(s) that may apply. (If you are awarded a City contract, the same exemption designation will carry forward to the contract records.)The City will not withhold materials from disclosure simply because you mark them with a document header or footer, page stamp, or a generic statement that a document is non-disclosable, exempt, confidential, proprietary, or protected. Do not identify an entire page as exempt unless each sentence is within the exemption scope; instead, identify paragraphs or sentences that meet the specific exemption criteria you cite on the Form. Only the specific records or portions of records properly listed on the Form will be protected and withheld for notice. All other records will be considered fully disclosable upon request.If the City receives a public disclosure request for any records you have properly and specifically listed on the Form, the City will notify you in writing of the request and will postpone disclosure. While it is not a legal obligation, the City, as a courtesy, will allow you up to ten business days to file a court injunction to prevent the City from releasing the records (reference RCW 42.56.540). If you fail to obtain a Court order within the ten days, the City may release the documents.The City will not assert an exemption from disclosure on your behalf. If you believe a record(s) is exempt from disclosure you are obligated to clearly identify it as such on the Form and submit it with your solicitation. Should a public record request be submitted to Purchasing for that record(s), you can then seek an injunction under RCW 42.56 to prevent release. By submitting a bid document, the bidder acknowledges this obligation; the proposer also acknowledges that the City will have no obligation or liability to the proposer if the records are disclosed.Requesting Disclosure of Public RecordsThe City asks bidders and their companies to refrain from requesting public disclosure of bids until an intention to award is announced. This measure is intended to protect the integrity of the solicitation process particularly during the evaluation and selection process or in the event of a cancellation or re-solicitation. With this preference stated, the City will continue to be responsive to all requests for disclosure of public records as required by State Law. If you do wish to make a request for records, visit https://www.seattle.gov/public-records/public-records-request-center.
50
Ethics Code
Familiarize yourself with the City Ethics code: http://www.seattle.gov/ethics/etpub/et_home.htm. For an in-depth explanation of the City’s Ethics Code for Contractors, Vendors, Customers and Clients, visit: http://www.seattle.gov/ethics/etpub/faqcontractorexplan.htm. Any questions should be addressed to Seattle Ethics and Elections Commission at 206-684-8500.No Gifts and Gratuities.Consultants shall not directly or indirectly offer anything (such as retainers, loans, entertainment, favors, gifts, tickets, trips, bonuses, donations, special discounts, work, or meals) to any City employee, volunteer or official, if it is intended or may appear to a reasonable person to be intended to obtain or give special consideration to the Consultant. An example of this is giving sporting event tickets to a City employee who is also on the evaluation team of a solicitation to which you submitted or intend to submit. The definition of what a “benefit” would be is broad and could include not only awarding a contract but also the administration of the contract or evaluating contract performance. The rule works both ways, as it also prohibits City employees from soliciting items from Consultants.Involvement of Current and Former City Employees.The Consultant Questionnaire within your submittal documents prompts you to disclose any current or former City employees, official or volunteer that is working or assisting on solicitation of City business or on completion of an awarded contract. Update that information during the contract.Contract Workers with over 1,000 Hours.The Ethics Code applies to Consultant workers that perform over 1,000 cumulative hours on any City contract during any 12-month period. Any such employee must abide by the City Ethics Code. The Consultant is to be aware and familiar with the Ethics Code accordingly.No Conflict of Interest. Consultant (including officer, director, trustee, partner or employee) must not have a business interest or a close family or domestic relationship with any City official, officer or employee who was, is, or will be involved in selection, negotiation, drafting, signing, administration or evaluating Consultant performance. The City shall make sole determination as to compliance.Campaign Contributions (Initiative Measure No. 122)Elected officials and candidates are prohibited from accepting or soliciting campaign contributions from anyone having at least $250,000 in contracts with the City in the last two years or who has paid at least $5,000 in the last 12 months to lobby the City. See Initiative 122, or call the Ethics Director with questions.
51
Background Checks and Immigrant Status
Option 1 – Background Checks Not RequiredThe City may require background checks for the Consultant, as well as some or all of their employees and contracted workers who may perform work under this Agreement. The City reserves the right to require such background checks at any time. The City has strict policies regarding the use of background checks, criminal checks, and immigrant status for contract workers. The policies are incorporated into this Agreement and available for viewing on-line at http://www.seattle.gov/purchasing-and-contracting/social-equity/background-checks.Option 2 – Background Checks Are RequiredBackground checks will be required for workers that will perform the work under the contract resulting from this solicitation. The City may require background checks for the Consultant, as well as some or all of their employees and contracted workers who may perform work under this Agreement. The City reserves the right to require such background checks at any time. The City has strict policies regarding the use of background checks, criminal checks, and immigrant status for contract workers. The policies are incorporated into this Agreement and available for viewing on-line at http://www.seattle.gov/purchasing-and-contracting/social-equity/background-checks.
52
Use of Hyperlinks and URLs in Submittals
Hyperlinks and URLs to web sites or references to attachments may not be used in documents submitted in response to this solicitation, unless specifically requested in the submittal requirements. The City is not obligated to evaluate, review, or score any information submitted in the form of a hyperlink or URL. Information and documentation requested for the evaluation process must be submitted in the format indicated in the solicitation instructions.