City of Seattle

Questionnaire

Columbia Branch - Historical Carnegie Building Renovation and Seismic Structural Upgrade of Unreinforced Masonry Building (URM)

SPL PW# A&E Seismic 2026-05 COL

Project Questions

1

Letter of interest (optional)

Type: fileUpload

2

Proof of Legal Business Name

Type: fileUpload

Provide a certificate or documentation from the Secretary of State in which you incorporated that shows your company legal name. Many companies use a “Doing Business As” name or nickname in daily business; the Library requires the legal name for your company. When preparing all forms below, use the proper company legal name. Your company’s legal name can be verified through the State Corporation Commission in the state in which you were established, which is often located within the Secretary of State’s Office for each state. For the State of Washington, see http://www.secstate.wa.gov/corps/
3

Statement of Qualifications

Type: fileUpload

Provide a single page that lists each Minimum Qualification, and exactly how you achieve each minimum qualification. Remember that the determination you have achieved all the minimum qualifications is made from this page. The evaluation committee is not obligated to check references or search other materials to make this decision
4

Minimum Qualifications

Type: longAnswer

This response is mandatory. The determination you have achieved all minimum qualifications is made from this section alone, and therefore, the Evaluation Committee is not obligated to check references or search other materials in your proposal to make this decision.For each Minimum Qualification listed below, please describe how you meet the minimum qualification.Minimum Qualification #1Provide Minimum QualificationMinimum Qualification #2Provide Minimum QualificationMinimum Qualification #3Provide Minimum Qualification
5

Consultant Inclusion Plan

Type: download

Please download the below documents, complete, and upload.
6

Consultant Questionnaire

Type: download

Please download the below document, complete, and upload. Provide information to the extent this information is available. If your response is incomplete or requires further description, the City may request additional information within a specified deadline, or may determine the missing information is immaterial.
7

Contract Modifications

Type: fileUpload

Make requested changes to the Contract language using track changes and upload here.