City of Seattle

Criteria

On-Call Land Surveying Services

25-239-S

Evaluation Criteria

1

There are no minimum qualifications required in order for a consultant to submit a response to this solicitation.
2

The City consultant contract is attached (See Attachments Section).The City has attached its boilerplate contract terms so Proposers can be familiar with the boilerplate and the non-negotiable terms before submitting a proposal. Any questions about the City’s boilerplate should be made in advance of submittal. If a Consultant seeks to modify the Contract, the Consultant must request that within their Proposal response as taking an “Exception”. The Consultant must provide a revised version that shows their proposed alternative contract language. The City is not obligated to accept such proposed changes. If you request Exceptions that materially change the character of the contract, the City may reject the Consultant’s Proposal as non-responsive. The City cannot modify provisions mandated by Federal, State or City law: Equal Benefits, Audit (Review of Vendor Records), WMBE and EEO, Confidentiality, and Debarment, or mutual indemnification. Such Exceptions would be summarily disregarded.Although the City may open discussions with the highest ranked apparent successful Proposer to align the proposal or contract to best meet City needs, this does not ensure negotiation of modifications proposed by the consultant through the exception process above.
3

Initial Screening

The City will review responses for responsiveness and responsibility. Those found responsive and responsible based on an initial review shall proceed to Step 2. Equal Benefits, Minimum Qualifications, an Inclusion Plan (if applicable), satisfactory financial responsibility and other elements are screened in this Step. A significant failure to perform on past City projects may also be considered in determining the responsibility of a firm.
4

Minimum qualifications are required for a Consultant to be eligible to submit a proposal response. Your submittal response must show compliance to these minimum qualifications. Those that are not responsive to these qualifications shall be rejected by the City without further consideration:ADD MIN QUALS HERE
5

The City consultant contract is attached (See Attachments Section).Consultants submit proposals understanding all Contract terms and conditions are mandatory. Response submittal is agreement to the Contract without exception. The City reserves the right to negotiate changes to submitted proposals and to change the City's otherwise mandatory Contract form during negotiations. If the Consultant is awarded a contract and refuses to sign the attached Contract form, the City may reject the Consultant from this and future solicitations for the same work. Under no circumstances shall Consultant submit its own boilerplate of terms and conditions.
6

SPU intends to award up to four contracts, or more if deemed in SPU’s interest, for an initial estimated contract amount of $600,000 each for three (3) years. The option to extend the on-call contract for an additional two (2) years with an additional estimated $400,000 may be amended to the on-call based on performance at the conclusion of year three (3). Estimated total value of each contract may be $1Million. Under no circumstances shall this contract or subsequent work assignments go beyond five (5) years (SMC 20.50.040 G).
7

Protests

Interested parties that wish to protest any aspect of this RFQ selection process shall provide written notice to the Procurement Contact. Note the City shall notify Federal Transit Administration if protesting a solicitation for contracts with FTA funds.
8

Registration into the City's Procurement Portal

If you have not previously done so, register at: https://procurement.opengov.com/portal/seattle, then subscribe to the City’s Procurement Portal. The Procurement Portal is used by City staff to identify companies for future solicitation lists and check certifications. Women- and minority-owned firms are asked to self-identify their business as such in OpenGov. Registration in the City's Procurement Portal is required to submit a response to this solicitation.
9

The City expects to achieve the following outcomes through this consultant solicitation:Contract with a Consultant team as an expert technical resource of licensed surveyors.Contract with a Consultant team to deliver quality topographic surveys, utility base maps, right-of-way determinations, legal descriptions, exhibit maps, terrestrial LiDAR, aerial LiDAR and photogrammetry, bathymetric surveys, subsurface utility locates, with the ability\expertise to respond to emergency work requests.Contract with a team that is committed to the City’s women and minority owned business enterprise (WMBE) program, submission of an inclusion plan that is meaningful and feasible, and supportive of the continued growth of the consultant community serving the Seattle area.
10

Seattle Public Utilities (SPU) is requesting Statements of Qualifications from qualified Consultant Teams to provide On-Call Land Surveying Services. The Consultant is expected to deliver of a wide variety of infrastructure improvements, along with supporting Seattle Department of Transportation’s (SDOT) aggressive goals to construct pedestrian, bicycle, transit, roadway structure, traffic operations, and roadway improvements over the next ten years.SPU intends to award up to four (4) consultant teams, or more if deemed in SPU’s interest, to provide as-needed land surveying services. No specific projects have been identified at this time. Rather, individual scopes of work will be determined based on planning, priority and budget and will be negotiated with the consultant as funding becomes available. Those individual scopes of work are issued in a Work Assignment with varying scopes, dates for milestones and deliverables. Under no circumstances shall this contract or subsequent work assignments go beyond five (5) years (SMC 20.50.040 G).SPU does not guarantee any minimum quantity of work under this contract.
11

Procurement Contact: Jamie Cortez, Contracts and Procurement Advisor, jamie.cortez@seattle.gov, (206) 684-5021Qualifications are to be submitted through the e-Procurement portal at https://procurement.opengov.com/portal/seattle, no later than 1:00 pm on Tuesday, April 7, 2026.Unless authorized by the Procurement Contact, no other City official or employee may speak for the City regarding this solicitation until award is complete. Any Respondent contacting other City officials or employees does so at Respondent’s own risk. The City is not bound by such information.
12

The City consultant contract is attached. See Attachments Section, Attachment 1.The City has attached its boilerplate contract terms to allow Respondents to be familiar with boilerplate, and the non-negotiable terms before submitting a proposal. The City may negotiate with the highest ranked apparent successful Respondent. The City cannot modify contract provisions mandated by Federal, State or City law: Equal Benefits, Audit (Review of Vendor Records), WMBE and EEO, Confidentiality, and Debarment or mutual indemnification. Exceptions to those provisions will be summarily disregarded.
13

6.1 Scope of Work

Any services performed under this contract will be issued as a series of Work Assignments. The scope, schedule, and budget for each Work Assignment will vary by project. There is no minimum guarantee of work for any contracts executed from this solicitation.The Scope of Work Elements expected, but not limited to be performed under this On-Call Contract with the services/functions given above may include, but are not limited to: Services Anticipated:Project Management of Work.Conventional Land Surveying/Topographic Survey.Laser Scanning and Mapping.Subsurface Utility Locating (including potholing) and Mapping.Rights of Entry.UAS Photogrammetry\LiDAR.Bathymetric Surveys.Boundary Surveys.Legal Descriptions with Exhibit Maps.Control Surveys.Settlement monitoring.Quality Assurance and Quality Control of Work.Traffic Control Plans for Street Use Permit. Scope Elements: Typical Right-Of-Way Survey ElementsSigns and all pavement markings.All traffic signal equipment including: handholes, signals cabinets, signal poles, span wires, pedestrian pushbuttons, vehicular signal heads, and pedestrian signal heads.Top of curbs, bottom of curbs, flow lines, front and back of sidewalk, and all grade breaks and limits associated with driveways and curbs ramps.Walls and Rockeries.Pavement surfaces (identified by type) and joints between dissimilar paving materials.On Street Parking delineations.Vegetation, trees (evergreen and deciduous) label with common name, caliper diameter, and canopy diameter as measured on aerial photos or equivalent. Existing Bus Stop amenities, furniture, and shelter locations.Existing overhead utility lines including transit overhead centenary systems and private telecommunication.Ground measurements will be captured sufficient to generate an accurate digital terrain model (DTM) at one-foot contours. Building overhangs and awnings within the Right-of-Way.Water limits such as existing edge of water, or ordinary high-water mark.Bridge deck corners, and bridge deck joints.Bridge column and/or footing locations.Typical Private Property/Beyond Right of Way Elements: Building faces.Garage entrances.Door thresholds.Retaining walls.Trees.Fences and fence posts.Steps and walkways.Driveway locations if located at back of sidewalk or behind curb.At existing driveway locations, a sufficient number of survey shots shall be taken within private property to establish grade of driveway transitions onto private property.Typical Under and Above Ground Utility Elements:Surface observable utilities, such as: all utility castings, power poles, guy wires and anchors, street light poles, vaults, risers, fire hydrants, culverts, survey monument castings, and overhead utility lines.Stormwater and Sanitary Sewer structures – Catch Basins, Inlets and Storm Drain Manholes – center of lids.Stormwater and Sanitary sewer structures and inverts obtained.Underground utilities located through “One Call”, records research, or potholing where required. Anticipated Deliverables:Typical Land Survey MappingBase map drawings (AutoCAD Civil3D 2025 or later), encompassing the Survey Limits, containing all existing surveyed features. Integrated Land XML-compatible digital terrain model.An AutoCAD Civil3D 2025 (or later) XYZ point drawing file in PNEZD format (Point number, Northing, Easting, Elevation and Description).Point Cloud files provided in .pts, .LAS or .e57 format..JPG image files.Survey field notes.Typical Right-of-Way and Survey Control Mapping:Monuments.Right-of-Way centerlines lines.Right-of-Way limit lines within the project limits. Right-of-way limit lines shall be offsets from monument/Right-of-Way centerlines based on City of Seattle historical maps and King County Recorder’s Office data (recorded surveys, dedications, property lines, easements, etc.).Parcel lines.Building face outlines, address numbers and business names.
14

Qualification Evaluation

Qualifications shall be evaluated using the evaluation criteria in the Evaluation Section.
15

Pre-Submittal Conference

The City offers an optional pre-submittal conference at the time, date and location on the Timeline. Respondents are highly encouraged to attend but not required to attend to be eligible to submit their qualifications. The meeting answers questions about the solicitation and clarifies issues. This also allows Respondents to raise concerns. Failure to raise concerns over any issues at this opportunity will be a consideration in any protest filed regarding such items known as of this pre-submittal conference.
16

Limited Debriefs

The City issues results and award decisions to all Respondents. The City provides debriefing on a limited basis for the purpose of allowing respondents to understand how they may improve in future solicitation opportunities.
17

Interviews

The City may interview top ranked firms that are considered to be the most competitive. If interviews are conducted, rankings of firms shall be determined by the City, using the combined results of interviews and submittals. Consultants invited to interview are to bring the assigned key person(s) named by the Consultant in the Proposal, and may bring other key personnel named in the Proposal. The Consultant shall not bring individuals who do not work for the Consultant or are not on the project team without advance authorization by the Procurement Contact. If interviews are conducted, they will be worth the points listed in the Proposal Evaluation section.
18

Questions

Respondents may submit their questions through the Procurement Portal. Respondents may also email questions to the Procurement Contact until the deadline stated in the Timeline. Failure to request clarification of any inadequacy, omission, or conflict will not relieve the Consultant of responsibilities under any subsequent contract. It is the responsibility of the interested Consultant to assure they receive responses to questions if any are issued.
19

Instructions to the Apparently Successful Consultant(s)

The Apparently Successful Consultant(s) will receive an Intent to Award Letter from the Procurement Contact after award decisions are made by the City. The Letter will include instructions for final submittals due prior to execution of the contract.Once the City has finalized and issued the contract for signature, the Consultant must execute the contract and provide all requested documents within ten (10) business days. This includes attaining a Seattle Business License, payment of associated taxes due, and providing proof of insurance. If the Consultant fails to execute the contract with all documents within the ten (10) day time frame, the City may cancel the award and proceed to the next ranked Consultant, or cancel or reissue this solicitation. Cancellation of an award for failure to execute the Contract as attached may disqualify the firm from future solicitations for this same work.
20

References

The City may contact one or more references. The City may use references named or not named by the Proposer. The City may also consider the results of performance evaluations issued by the City on past projects.
21

Changes to the RFQ

The City may make changes to this RFQ if, in the sole judgment of the City, the change will not compromise the City’s objectives in this solicitation. Any change to this RFQ will be made by formal addendum issued by the City, through the Procurement Portal at https://procurement.opengov.com/portal/seattle and shall become part of this RFQ.
22

Checklist of Requirements Prior to Award

The Consultant(s) should anticipate the Letter will require at least the following. Consultants are encouraged to prepare these documents when possible, to eliminate risks of late compliance.Seattle Business License is current and all taxes due have been paid.State of Washington Business License.Evidence of Insurance (if required)Special Licenses (if any)Form W-9 if a new Consultant for the City
23

Receiving Addenda and/or Question and Answers

It is the obligation and responsibility of the Consultant to learn of addenda, responses, or notices issued by the City, through the Procurement Portal. Some third-party services independently post City of Seattle solicitations on their websites. The City does not guarantee that such services have accurately provided all the information published by the City.All submittals sent to the City may be considered compliant with or without specific confirmation from the Consultant that any and all addenda was received and incorporated into your response. However, the Project Manager reserves the right to reject any submittal that does not fully incorporate Addenda that is critical to the project.
24

Selection

The City shall select the highest ranked Proposer(s) for award, including written proposal and the interview (if applicable). The City reserves the right to make a final selection based on the combined results and/or the overall consensus of the Consultant Evaluation Committee.
25

Insurance Requirements for Award

Proof of insurance is required, see Attachments for Insurance Transmittal Form.
26

Contract Negotiations

The City may negotiate elements of the proposal as required to best meet the needs of the City, with the apparent successful Proposer. The City may negotiate any aspect of the proposal or the solicitation. The City does not intend to negotiate the base contract, which has been attached (See Attachments).
27

Qualifications Submittal

Responses must be received by the City no later than the date and time in the Timeline, except as revised by Addenda. The submitter has full responsibility to ensure the response is submitted to the City's Procurement Portal within the deadline. The Procurement Portal will not allow vendors to upload submissions past the deadline.A. All pages are to be 8.5 x 11 inch, numbered sequentially and closely follow the requested formats.B. The City has page limits specified in the submittal instructions section. Any pages that exceed the page limit will be excised from the document for purposes of evaluation.C. The submitter has full responsibility to ensure the response arrives at the City within the deadline. A response delivered after the deadline may be rejected unless waived as immaterial by the City givenspecific fact-based circumstances.
28

Respondent Responsibility to Provide Full Response

It is the Respondent's responsibility to respond in a manner that does not require interpretation or clarification by the City. The Respondent is to provide all requested materials, forms and information. The Respondent is to ensure the materials are submitted properly and accurately reflect the Respondent’s qualifications. During scoring and evaluation (prior to interviews if any), the City will rely upon the submitted materials and shall not accept materials from the Respondent after the RFQ deadline; this does not limit the City’s right to consider additional information (such as references that are not provided by the Respondent but are known to the City, or past City experience with the consultant), or to seek clarifications as needed.
29

Electronic Submittal

The City requires electronic submittal.Upload your submission to the respective procurement opportunity online at https://procurement.opengov.com/portal/seattle by the submittal deadline. We recommend you give yourself sufficient time and at least ONE (1) day before Closing Time to begin the uploading process and to finalize your submission.Do not embed any documents within your uploaded files, as they will not be accessible or evaluated. Please see the Attachments section for specifications and attachments.Hyperlinks and URLs to web sites or references to attachments may not be used in documents submitted in response to this solicitation, unless specifically requested in the submittal requirements. The City is not obligated to evaluate, review, or score any information submitted in the form of a hyperlink or URL.Responses to the solicitation will not be visible to the city until after the solicitation closing time.Uploading large documents may take significant time, depending on the size of the file(s) and your Internet connection speed.You will receive an email confirmation once you finalize your submission.OpenGov Procurement works with the latest versions of Chrome, Firefox, Microsoft Edge, and Safari for Mac.OpenGov Procurement does not work with the following versions of Internet Explorer, Google Chrome <54, Microsoft Edge <14, Safari <10.1, and Firefox <47Any risks associated with an electronic submittal are borne by the Proposer.The City uses OpenGov Procurement for accepting and evaluating proposals electronically. For software support, contract OpenGov. Live support is available 4am to 7pm Pacific Time, Monday through Friday, excluding holidays.Chat: Click the chat bubble on OpenGovPhone: (650) 336-7167Email: procurement-support@opengov.comSelf-service (available 24/7): OpenGov Help Center (https://opengov.my.site.com/support/s/)
30

Right to Award to next ranked Consultant

If a contract is executed resulting from this solicitation and is terminated within 90-days, the City may return to the solicitation process to award to the next highest ranked responsive Consultant by mutual agreement with such Consultant. New awards thereafter are also extended this right.
31

Prohibited Contacts

Respondents shall not interfere in any way to discourage other potential and/or prospective consultants from submitting or considering participation in the submittal process. Prohibited contacts includes but is not limited to any contact, whether direct or indirect (i.e. in writing, by phone, email or other, and by the Respondent or another person acting on behalf of the Respondent) to a likely firm or individual that may discourage or limit competition. If such activity is evidenced to the satisfaction and in sole discretion of the City department, the Respondent that initiates such contacts may be rejected from the process.
32

Repeat of Evaluation

If no Consultant is selected at the conclusion of all the steps, the City may return to any step in the process to repeat the evaluation with those proposals active at that step. The City shall then sequentially step through all remaining steps as if conducting a new evaluation process. The City reserves the right to terminate the process if no proposals meet its requirements.
33

License and Business Tax Requirements

The Consultant must meet all applicable licensing requirements immediately after contract award or the City may reject the Consultant. Companies must license, report and pay revenue taxes for the Washington State business License (UBI#) and Seattle Business License, if required by law. Carefully consider those costs before submitting an offer, as the City will not separately pay or reimburse such costs.Seattle Business Licensing and associated taxesIf you have a “physical nexus” in the city, you must obtain a Seattle Business license and pay all taxes due before the Contract can be signed. A “physical nexus” means you have physical presence, such as: a building/facility/employee(s) in Seattle, you make sales trips into Seattle, your own company drives into Seattle for product deliveries, and/or you conduct service work in Seattle (repair, installation, service, maintenance work, on-site consulting, etc). We provide a Consultant Questionnaire Form in our submittal package items later in this RFP/RFQ, and it will ask you to specify if you have “physical nexus”.All costs for any licenses, permits and Seattle Business License taxes owed shall be borne by the Consultant and not charged separately to the City. The apparent successful Consultant(s) must immediately obtain the license and ensure all City taxes are current, unless exempted by City Code due to reasons such as no physical nexus. Failure to do so will cause rejection of the submittal. The City of Seattle Application for a Business License and additional licensing information can be found this page here: https://www.seattle.gov/city-finance/business-taxes-and-licenses/business-licenses For Questions and Assistance, call the Revenue and Consumer Protection (RCP) office which issues business licenses and enforces licensing requirements. The general e-mail is tax@seattle.gov. The main phone is 206-684-8484. Self-Filing You can pay your license and taxes on-line https://www.filelocal-wa.gov/Default_FileLocal.aspx If a business has extraordinary balances due on their account that would cause undue hardship to the business, the business can contact the License and Tax Administration office at tax@seattle.gov or 206-684-8484 to request additional assistance. Those holding a City of Seattle Business license may be required to report and pay revenue taxes to the City. Such costs should be carefully considered by the Consultant prior to submitting your offer. When allowed by City ordinance, the City will have the right to retain amounts due at the conclusion of a contract by withholding from final invoice payments.
34

State Business Licensing

Before the contract is signed, you must have a State of Washington business license (a “Unified Business Identifier” known as a UBI#). If the State of Washington has exempted your business from State licensing (some foreign companies are exempt and sometimes, the State waives licensing because the company has no physical presence in the State), then submit proof of that exemption to the City. All costs for any licenses, permits and associated tax payments due to the State because of licensing shall be borne by the Consultant and not charged separately to the City. Instructions to apply for a business license can be found at https://dor.wa.gov/open-business/apply-business-license and the State of Washington Department of Revenue contact help page at https://dor.wa.gov/contact.
35

Federal Excise Tax

The City is exempt from Federal Excise Tax.
36

No Guaranteed Utilization

The City does not guarantee utilization of any contract(s) awarded through this RFQ process. The solicitation may provide estimates of utilization; such information is for Consultant convenience and not a usage guarantee. The City reserves the right to issue multiple or partial awards, and/or to order work based on City needs. The City may turn to other appropriate contract sources or supplemental contracts to obtain these same or similar services. The City may re-solicit for new additions to the Consultant pool. Use of such supplemental contracts does not limit the right of the City to terminate existing contracts for convenience or cause.
37

Expansion Clause

The contract limits expansion of scope and new work not expressly provided for within the RFQ.Expansion for New Work (work not specified within the original Scope of Work Section of this Agreement, and/or not specified in the original RFQ as intended work for the Agreement) must comply with the following:(a) New Work is not reasonable to solicit separately; (b) is for reasonable purpose; (c) was not reasonably known by the City or Consultant at time of solicitation or was mentioned as a possibility in the solicitation (i.e. future phases of work, or a change in law); (d) is not significant enough to be regarded as an independent body of work; (e) would not attract a different field of competition; and (f) does not change the identity or purpose of the Agreement. The City may make exceptions for immaterial changes, emergency or sole source conditions, or other situations required in City opinion. Certain changes are not subject to these limitations, such as additional phases of Work anticipated during solicitation, time extensions, and Work Orders issued on an On-Call contract. Expansion must be mutually agreed and issued by the City through written Addenda. New Work performed before an authorizing Amendment may not be eligible for payment.The City reserves the right to independently solicit and award any New Work to another firm when deemed appropriate or required by City policy.
38

Effective Dates of Offer

Solicitation responses are valid until the City completes award. Should any Respondent object to this condition, they must object prior to the Q&A deadline in the Timeline.
39

Cost of Preparing Submittals

The City is not liable for costs incurred by the Respondent to prepare, submit and present qualifications, interviews and/or demonstrations.
40

Readability

The City’s ability to evaluate submissions is influenced by the organization, detail, comprehensive material and readable format of the response.
41

Changes or Corrections to Submittal

Prior to the submittal closing date and time established for this RFQ, a Consultant may change or correct its proposal by following the Instructions here: https://opengov.my.site.com/support/s/article/4f4218bf-7da6-4fc6-b0c3-7eade0776ebe. No change to a submission shall be made after the solicitation closing date and time.
42

Errors in Submissions

Respondents are responsible for errors and omissions in their submissions. No error or omission shall diminish the Respondent’s obligations to the City.
43

Withdrawal of Submission

A submittal may be withdrawn at any time through the Procurement portal prior to the closing date or by written request of the submitter.
44

Rejection of Submissions

The City may reject any or all submissions with no penalty. The City may waive immaterial defects and minor irregularities in any submitted response.
45

Incorporation of RFQ and Respondent Submission in Contract

This RFQ and Respondent’s submission, including promises, warranties, commitments, and representations made in the successful response once accepted by the City, are binding and incorporated by reference in the City’s contract with the Respondent.
46

Independent Contractor

The Consultant works as an independent contractor. The City will provide appropriate contract management, but that does not constitute a supervisory relationship to the Consultant. Consultant workers are prohibited from supervising City employees or from direct supervision by a City employee. Prohibited supervision tasks include conducting a City of Seattle Employee Performance Evaluation, preparing and/or approving a City of Seattle timesheet, administering employee discipline, and similar supervisory actions.Contract workers shall not be given City office space unless expressly provided for below, and in no case shall such space be provided for over 36 months without specific authorization from the City.The City will not provide space in City offices for performance of this work. Consultants will perform most work from their own office space or the field.
47

Equal Benefits

Seattle Municipal Code Chapter 20.45 (SMC 20.45) requires consideration of whether Consultants provide health and benefits that are the same or equivalent to the domestic partners of employees as to spouses of employees, and of their dependents and family members. The Consultant Questionnaire requested in the Response Materials and Submittal section includes materials to designate your equal benefits status.
48

Women and Minority Subcontracting

The Mayor’s Executive Order and City ordinance require the maximum practicable opportunity for successful participation of minority and women-owned subcontracts. All proposers must agree to SMC Chapter 20.42, and seek meaningful subconsultant opportunities with WMBE firms. The City requires a plan for including minority- and women-owned firms, which becomes a material part of the contract. The Plan must be responsive in the opinion of the City, which means a meaningful and successful search and commitments to include WMBE firms for subcontracting work. The City reserves the right to improve the Plan with the winning Consultant before contract execution. Consultants should use selection methods and strategies sufficiently effective for successful WMBE participation. At City request, Consultants must furnish evidence such as copies of agreements with WMBE subconsultants either before contract execution or during contract performance. The winning Consultant must request written approval for changes to the Inclusion Plan once it is agreed upon. This includes changes to goals, subconsultant awards and efforts.WMBE firms need not be state certified to meet the City's WMBE definition. The City defines WMBE firms as at least 51% (percent) owned by women and/or minority. To be recognized as a WMBE, register on the City’s Procurement Portal. Federally funded transportation projects require a Disadvantaged Business Enterprises (DBE) program; for that program, firms must be certified by the Washington State Office of Minority and Women Business Enterprises (OMWBE).
49

Insurance Requirements

Any special insurance requirements are provided as an Attachment. If attached, provide proof of insurance and additional insured endorsement policy language to the City before Contract execution. The apparent successful Proposer must promptly provide proof of insurance to the City upon receipt of the notice of intent to award.Consultants are encouraged to immediately contact their Broker to begin preparation of the required insurance documents, if the Consultant is selected as a finalist. Respondents may elect to provide the requested insurance documents within their Submittal.
50

Proprietary Materials

The State of Washington’s Public Records Act (Release/Disclosure of Public Records): Under Washington State Law (reference RCW Chapter 42.56, the Public Records Act) all materials received or created by the City of Seattle are considered public records. These records include but are not limited to bid or proposal submittals, agreement documents, contract work product, or other bid material. The State of Washington’s Public Records Act requires that public records must be promptly disclosed by the City upon request unless that RCW or another Washington State statute specifically exempts records from disclosure. Exemptions are narrow and explicit and are listed in Washington State Law (Reference RCW 42.56 and RCW 19.108).Respondents must be familiar with the Washington State Public Records Act and the limits of record disclosure exemptions. For more information, visit the Washington State Legislature’s website at http://app.leg.wa.gov/rcw/default.aspx?cite=42.56.If you have any questions about disclosure of the records you submit with your response, contact the Procurement Contact named in this document.Marking Your Records Exempt from Disclosure (Protected, Confidential, or Proprietary)As mentioned above, all City of Seattle offices (“the City”) are required to promptly make public records available upon request. However, under Washington State Law some records or portions of records are considered legally exempt from disclosure and can be withheld. A list and description of records identified as exempt by the Public Records Act can be found in RCW 42.56 and RCW 19.108.If you believe any of the records you are submitting to the City as part of your bid/proposal or contract work products, are exempt from disclosure you can request that they not be released before you receive notification. To do so you must complete the City Non-Disclosure Request Form (“the Form”) provided by the City (see page 4 on the Consultant Questionnaire) and very clearly and specifically identify each record and the exemption(s) that may apply. (If you are awarded a City contract, the same exemption designation will carry forward to the contract records.)The City will not withhold materials from disclosure simply because you mark them with a document header or footer, page stamp, or a generic statement that a document is non-disclosable, exempt, confidential, proprietary, or protected. Do not identify an entire page as exempt unless each sentence is within the exemption scope; instead, identify paragraphs or sentences that meet the specific exemption criteria you cite on the Form. Only the specific records or portions of records properly listed on the Form will be protected and withheld for notice. All other records will be considered fully disclosable upon request.If the City receives a public disclosure request for any records you have properly and specifically listed on the Form, the City will notify you in writing of the request and will postpone disclosure. While it is not a legal obligation, the City, as a courtesy, will allow you up to ten business days to file a court injunction to prevent the City from releasing the records (reference RCW 42.56.540). If you fail to obtain a Court order within the ten days, the City may release the documents.The City will not assert an exemption from disclosure on your behalf. If you believe a record(s) is exempt from disclosure you are obligated to clearly identify it as such on the Form and submit it with your solicitation. Should a public record request be submitted to Purchasing for that record(s), you can then seek an injunction under RCW 42.56 to prevent release. By submitting a bid document, the bidder acknowledges this obligation; the proposer also acknowledges that the City will have no obligation or liability to the proposer if the records are disclosed.Requesting Disclosure of Public RecordsThe City asks bidders and their companies to refrain from requesting public disclosure of bids until an intention to award is announced. This measure is intended to protect the integrity of the solicitation process particularly during the evaluation and selection process or in the event of a cancellation or re-solicitation. With this preference stated, the City will continue to be responsive to all requests for disclosure of public records as required by State Law. If you do wish to make a request for records, visit https://www.seattle.gov/public-records/public-records-request-center.
51

Ethics Code

Familiarize yourself with the City Ethics code: http://www.seattle.gov/ethics/etpub/et_home.htm. For an in-depth explanation of the City’s Ethics Code for Contractors, Vendors, Customers and Clients, visit: http://www.seattle.gov/ethics/etpub/faqcontractorexplan.htm. Any questions should be addressed to Seattle Ethics and Elections Commission at 206-684-8500.No Gifts and Gratuities.Consultants shall not directly or indirectly offer anything (such as retainers, loans, entertainment, favors, gifts, tickets, trips, bonuses, donations, special discounts, work, or meals) to any City employee, volunteer or official, if it is intended or may appear to a reasonable person to be intended to obtain or give special consideration to the Consultant. An example of this is giving sporting event tickets to a City employee who is also on the evaluation team of a solicitation to which you submitted or intend to submit. The definition of what a “benefit” would be is broad and could include not only awarding a contract but also the administration of the contract or evaluating contract performance. The rule works both ways, as it also prohibits City employees from soliciting items from Consultants.Involvement of Current and Former City Employees.The Consultant Questionnaire within your submittal documents prompts you to disclose any current or former City employees, official or volunteer that is working or assisting on solicitation of City business or on completion of an awarded contract. Update that information during the contract.Contract Workers with over 1,000 Hours.The Ethics Code applies to Consultant workers that perform over 1,000 cumulative hours on any City contract during any 12-month period. Any such employee must abide by the City Ethics Code. The Consultant is to be aware and familiar with the Ethics Code accordingly.No Conflict of Interest. Consultant (including officer, director, trustee, partner or employee) must not have a business interest or a close family or domestic relationship with any City official, officer or employee who was, is, or will be involved in selection, negotiation, drafting, signing, administration or evaluating Consultant performance. The City shall make sole determination as to compliance.Campaign Contributions (Initiative Measure No. 122)Elected officials and candidates are prohibited from accepting or soliciting campaign contributions from anyone having at least $250,000 in contracts with the City in the last two years or who has paid at least $5,000 in the last 12 months to lobby the City. See Initiative 122, or call the Ethics Director with questions.
52

Background Checks and Immigrant Status

The City may require background checks for the Consultant, as well as some or all of their employees and contracted workers who may perform work under this Agreement. The City reserves the right to require such background checks at any time. The City has strict policies regarding the use of background checks, criminal checks, and immigrant status for contract workers. The policies are incorporated into this Agreement and available for viewing on-line at http://www.seattle.gov/purchasing-and-contracting/social-equity/background-checks.
53

Interdepartmental Use of This Solicitation

This solicitation is issued for the benefit of Seattle Public Utilities (SPU). Other departments, divisions, or offices within the City may, at their discretion, use the results of this solicitation to establish their own separate contracts with the selected Consultant, provided such use is consistent with the scope and terms of this solicitation. Any contracts issued by other City departments are solely between that department and the Consultant. SPU is not a party to, and assumes no responsibility or liability for, such contracts.