City of Seattle
45th Ave SW Culvert Replacement and Habitat Restoration
PW#2025-017
Department
Public Works
Mark Nakagawara - Deputy Division Director
Summary
Project Description: This Project will replace the 45th Ave SW culvert and consists of the following elements of Work: civil demolition to include an in-stream by-pass, tree protection, civil site work, civil stream work, civil grading, civil utilities (drainage and water), civil paving (roadway), landscaping, structural work (soldier pile shoring, culvert construction consisting of cast-in-place concrete footings, shotcrete walls, and precast concrete cover), and electrical.Engineer's Estimate: $30,250,000Project Location: This Project is located in southwest Seattle along where Fauntleroy Creek crosses 45th Ave SW, between SW Director St on the north and SW Wildwood Pl on the south
Important Dates
Release Date
6/24/2026
Q&A Deadline
8/7/2026
Proposal Deadline
8/12/2026
Contact Information
Project Contact
Ryan Brady
Senior Civil Engineer
(206) 684-3617
700 Fifth Avenue, Suite 4900
PO Box 34018
Seattle, WA 98124-4018
Procurement Contact
Ian Hernandez
Sr. Construction Contracting Specialist
(206) 684-0128
700 5th Ave, Ste 4350
Seattle, WA 98104