City of Seattle
Attachments
45th Ave SW Culvert Replacement and Habitat Restoration
PW#2025-017
Project Documents
A - 1-02.4(2)_Geotechnical Report_FINAL_(PW#2025-017)
Filename: 1-02.4(2)_Geotechnical_Report_FINAL_(PW#2025-017).pdf
Type: other
Created: 6/23/2026
B - 1-02.4(8)_Early Works Power Relocation Drawings (PW#2025-054) for reference on PW#2025-017
Filename: 1-02.4(8)_Early_Works_Power_Relocation_Drawings_(PW#2025-054)_for_reference_on_PW#2025-017.pdf
Type: other
Created: 6/23/2026
C - 1-02.4(11)_CCTV 45th Ave SW Culvert Downstream to Upstream 201.5ft_9144 45TH AVE SW (PW#2025-017)
Filename: 1-02.4(11)_CCTV_45th_Ave_SW_Culvert_Downstream_to_Upstream_201.5ft_9144_45TH_AVE_SW_(PW#2025-017).mp4
Type: other
Created: 6/23/2026
D - 1-07.6(2)3_SWPPP_20260414_261-1128_45th Ave SW Culvert Replacement (PW#2025-017)
Filename: 1-07.6(2)3_SWPPP_20260414_261-1128_45th_Ave_SW_Culvert_Replacement_(PW#2025-017).pdf
Type: other
Created: 6/23/2026
Project Manual (PW#2025-017)
Filename: Project_Manual_(PW#2025-017).pdf
Type: projectDocument
Created: 6/23/2026
Bid Forms_(PW#2025-017)
Filename: Bid_Forms_(PW#2025-017).pdf
Type: projectDocument
Created: 6/23/2026
Drawings (PW#2025-017)
Filename: Drawings_(PW#2025-017).pdf
Type: projectDocument
Created: 6/23/2026