City of Seattle
South Park Water Quality Facility Site Demolition
PW#2025-049
Department
Public Works
Mark Nakagawara - Deputy Division Director
Summary
Project Description: This project consists of the following elements of work: Demolition of five existing structures : 18,690 SF warehouse, 2,400 SF garage, 2,200 SF shed, crane and crane tower, and a metal framed wheelhouse on an existing boat dock; retirement of existing utilities, removal, handling, and disposal of regulated building materials including: asbestos, lead-containing paint (LCP), Polychlorinated Biphenyls (PCBS), Mercury-Containing Light Tubes, and Chlorofluorocarbons (CFCs); construction stormwater and erosion control; contaminated soil removal, handling, and disposal, and vegetation and tree protectionEngineer's Estimate: $2,800,000 (without sales tax)Project Location: This project is located in the South Park neighborhood of Seattle, east of 8th Ave S, west of the Duwamish Waterway, north of S Kenyon, and south of S Portland St.
Important Dates
Release Date
4/29/2026
Q&A Deadline
5/15/2026
Proposal Deadline
5/20/2026
Contact Information
Project Contact
Ryan Brady
Senior Civil Engineer
(206) 684-3617
700 Fifth Avenue, Suite 4900
PO Box 34018
Seattle, WA 98124-4018
Procurement Contact
Gina Owens
Sr. Construction Contracts Specialist
(206) 684-7251
700 5th Avenue, Suite 4350
Seattle, WA 98124